Laserfiche WebLink
PUBLIC ?IEALTH SERACES �•4 fN .coc <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Z _ < <br /> Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer <br /> 445 N. San Joaquin Street • P.O. Box 388 0 Stockton, CA 95201-0388 <br /> Ikoa <br /> (209) 4683420 FEB 0 91994 <br /> FLAG CITY INC WAYNE HOLLINGSWORTH <br /> CECIL DILLON AMADOR CORPORATION <br /> 5501 VALLEYBROOK DR <br /> P O BOX 2180 <br /> P O BOX 6 <br /> LODI CA 95241-2180 <br /> BAKERSFIELD CA 93308 <br /> RE: Saddle City Chevron #90302 <br /> SITE CODE: 1706 <br /> 6421 W. Paddock Pl. <br /> Lodi, Ca 95242-9500 <br /> On January 26, 1994, the San Joaquin County Public Health Services, Environmental Health Division <br /> (PHS-EHD) Technical Review Committee (TRC) met to discuss the December 21, 1993 "Environmental <br /> Testing Project and Site Certification" report as submitted by Geological Technics Inc. In this report three <br /> (3) alternative approaches were offered and PHS-EHD evaluated each one. <br /> If site specific information warrants it, PHS-EHD can issue a letter stating soil contamination has been <br /> successfully remediated and remediation is ongoing for the remaining groundwater issue. Since this is not <br /> the case for this site, the TRC cannot recommend approval of either "Approach One" or "Approach Two" <br /> and will not issue an "interim site certification letter". <br /> The TRC has recommended that the five (5) underground tanks (UST) currently onsite be removed under <br /> permit by PHS-EHD. Since both the site and the tanks are noncompliant with current UST regulations, <br /> any delay in bringing both into compliance may jeopardize your ability to secure reimbursement under the <br /> UST Cleanup Fund at some future date. <br /> Intermittent monthly groundwater contamination may indicate only the beginning of a more serious <br /> problem and the TRC has indicated that an aggressive approach of removing the tanks and removing the <br /> existing contaminated soils is the acceptable approach for this site and the public health. <br /> In a meeting with Mr.Dillon, and Doug Wilson, <br /> Michael <br /> el Huggi , and <br /> Al n Biedermann, all ofPHS-EHD, held February8, 1994 at PHS-iane tEHD aplan of action was decided <br /> upon to bring the site into compliance. <br /> Your contractor will apply for a tank closure/removal permit by submitting a completed closure plan by <br /> March 1, 1994. <br /> An investigation to define the "zero-line" of soil and groundwater contamination shall be conducted <br /> immediately. PHS-EHD will require three (3) additional soil borings to be placed to the north, east, and <br /> west of the existing tank pit. <br /> All soil borings are to be drilled utilizing continuous core sampling techniques and one boring is to be <br /> constructed into a monitoring well approximately thirty (30) feet to the northwest of Monitoring Well 3. <br /> The two remaining soil borings are to be located directly north and northeast of the tank pit. These two <br /> borings shall collect ground water samples in addition to the soil samples and all samples are to be <br /> analyzed for BTEX and TPH-G constituents by approved EPA methods. <br /> A Division or San .loaquin Cnuntv Health Care Services <br />