My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000660
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000660
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 7:20:55 PM
Creation date
2/15/2019 3:12:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000660
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' FLAG CITY CHEVRON <br /> Assumptions Ground Water Pump Test Calculations <br />' <br />' • Pump Test No 1 extraction from EW-2 at constant ground water pumping rate of 4 0 GPM <br /> • Pump Test No 2 extraction from EW-2 at constant ground water pumping rate of 6 6 GPM <br />' • Pump Test No 3 extraction from EW-2 at constant ground water pumping rate of 10 0 GPM <br /> • Pump Test No 4 extraction from EW-3 at constant ground water pumping rate of 10 0 GPM <br /> I • The Jacobs Straight Line Method (Distance-Drawdown Method) can be utilized to <br /> calculate transmissivity(T) and specific yield utilizing draw-down versus distance on semi- <br />' logarithmic paper for each well location (Appendix F) <br /> T =transmissivity , S =specific yield <br />' Q =constant ground water pumping rate <br /> As =draw-down per 1-logarithmic cycle <br /> t =time of pump test <br /> ro =intercept of best fit line with the distance axis <br /> ie Pump Test No. 1: Q = 4.0 GPM; As = 2.7 ft.; t= 60 minute; ro = 17 ft. <br /> lT = 70Q-Os -4 70(4 0 GPM)- 2 7 ft= 104 ft/day <br /> T = 104 ft2/day x 1 gpd/ft - 0 134 ft2/day=774 gpd/ft <br /> IS = T(t) - 640 (r0)2 = (104 ft2/day)(60 min) -- (640)(17)2 = 0.034 <br />' Pump Test No. 2: Q = 6.6 GPM; As = 4.8 ft.; t= 600 minute; ro = 20.5 ft. <br /> T = 70Q-As 4 70(6 6 GPM) -4 8 ft= 96.25 ftZ/day <br /> T = 96 25 ft2/day x 1 gpd/ft-0 134 ft2/day= 718 gpd/ft <br /> S = T(t) - 640 (ra)2 = (96 25 ft2/day)(600 min) - (640)(20 5)2 =0.21 <br />' Pump Test No. 3: Q = 10.0 GPM; As = 6.3 ft.; t= 100 minute; ro = 24 ft. <br /> T = 70Q-As -+ 70(10 0 GPM) --- 6 3 ft = 111 ftZ/day <br /> IT = 111 ft2/day x 1 gpd/ft- 0 134 ft2/day= 829 gpd/ft <br /> S = T(t) - 640 (rp)2 = (I 11 ft2/day)(100 min) -- (640)(24)2 = 0.03 <br /> Pump Test No. 4: Q = 10.0 GPM; As = 3.8 ft.; t= 400 minute; ro = 33 ft. <br /> I T = 70Q-As -+ 70(10 0 GPM) - 3 8 ft = 184 ftZ/day <br /> T = 184 ft'/day x 1 gpd/ft- 0 134 ft2/day= 1,375 gpd/ft <br /> �1 S =T(t) - 640 (ro)2 = (184 ft2/day)(400 min) - (640)(3 3)2 = 0.11 <br /> IAdvanced GeoEnvironmental,Inc <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.