Laserfiche WebLink
09 May 2003 <br /> AGE-NC Project No 96-0232 <br /> ' Page I 1 of 16 <br /> ' isoconcentration map displaying the estimated extent of dissolved MTBE in the area of the ground <br /> water extraction wells is depicted in Figure 8 <br /> ' No other constituents of concern were detected above laboratory reporting limits m the water <br /> samples collected during the first quarter 2003 sampling event Analytical results of ground water <br /> pl <br /> monitoring well samples are summarized in Tables 5 and 6 The laboratory reports (McCampbell <br /> Analytical Inc work order nos 0303416, 0303417 and 0303448) and chain-of-custody forms are <br /> presented in Appendix H <br /> 4.0• SUMMARY OF FINDINGS FROM QUARTERLY ACTIVITIES <br />' Previous soil characteristics data obtained by a CPT investigation enabled AGE to define five <br /> informal hydrologic units (Final Remediation Plan, dated 31 August 2000) The informal <br /> hydrogeologic units were defined as First Zone (10-35 feet bsg), Second Zone (40-60 feet bsg), <br /> Rocky's Upper Zone (65-75 feet bsg), Secondary Aquifer Zone (85-105 feet bsg), and Prim <br /> Aquifer Zone (130-150 feet bsg) The Roc �' <br /> screened in the destroyed Roc ky's Upper Zone was the shallowest ground water zone <br /> Y ky's domestic drinking water well <br /> The results of pump and treat ground water remediation between 05 December 2002 and 25 March <br /> 2003 is as follows <br /> C Approximately 2,871,250 gallons of MTBE-impacted <br /> from <br /> wells EW-4, EW-5, EW-8, EW-9 and EW-10, which were completed in the Firswater were extractetZa e <br />' aquifer(Appendix A, Table 8), due to a pump malfunction, well EW-8 was substituted for <br /> EW-5 between 27 January and 25 March 2003 A total volume of approximately 19,499,136 <br />' gallons of MTBE-impacted water has been treated at the site since the start-up period in <br /> November 2000 (Table 8) <br /> Dissolved MTBE was detected from grab samples collected at the influent-end of the <br />' treatment system at concentrations between 21 gg/l and 83 <br /> ab <br /> water samples collected at the effluent-end of the ump and trelat system did not dete t, laboratory analysis of any <br /> petroleum constituents of concern (Table 1) y <br /> extracted ground water was calculated to be 0 86 pounds (Table 8,Appendix D)E removed from th <br /> Between 05 December 2002 and 25 March 2003, the mass of Me <br /> ° A plat of cumulative ground water pump and treat mass removal versus time and a plot of <br /> influent ground water MTBE concentrations versus time are included in Appendix E, during <br /> the first quarter 2003, a general casual trend of increasing MTBE concentrations is evident <br /> for the first time since initiation of the ground water pump-and-treat system <br /> Advanced GeoEnvironmeatai,Inc. <br />