Laserfiche WebLink
' 09 May 2003 <br /> AGE-NC Project No 96-0232 <br /> tPage 16 of 16 <br />' piping and UST sumps) The recent MTBE increases may be related to a new MTBE and/or <br /> petroleum release(s) <br />' 7.0 RECOMMENDATIONS <br />' Based upon data collected from the site, AGE recommends <br /> O Continued quarterly ground water monitoring and sampling of monitoring wells MW-1 <br />' through MW-18 <br /> • Continued coordinated quarterly ground water monitoring and sampling events with Three <br /> B's Truck Plaza <br />' • Continued ground water extraction from wells EW-4 and EW-5, extraction wells EW-7, <br /> EW-8, EW-9 and EW-10 should be alternated into the ground water extraction system <br />' • Additional Geoprobe soil borings for collection of grab ground water samples may be <br /> warranted between P-37 and MW-4,west and south of P-37 and north of P-38 to fully assess <br /> the extent of impacted ground water <br />' 8.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br />' available data points (ground water samples), and subsurface conditions may vary away from these <br /> data points No other warranty, expressed or implied,is made as to the professional interpretations, <br /> Iopinions and recommendations contained in this report <br /> I <br /> Advanced GeoEnvironmental,Inc <br /> I <br />