My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000679
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000679
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 8:22:33 PM
Creation date
2/15/2019 3:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000679
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 11 August 2003 <br /> • AGE-NC Project No 96-0232 <br />' Page 7of15 <br /> A coordinated effort was made with Three B's Truck Plaza (14749 Thornton Road, Lodi CA) to <br />' conduct ground water monitoring activities concurrently, the Three B's Truck Plaza ground water <br /> elevation results and analytical results are in Appendix F <br />' 3 1 WELL MONITORING AND PURGE PROCEDURES <br />' On 24 June 2003, the depth to ground water was measured at each monitoring well from the top of <br /> each well casing to the nearest 0 01-foot utilizing a Solinst water level meter The ground water <br />' elevation in each monitoring well was calculated by subtracting the measured depth to ground water <br /> from the surveyed casing elevation(Table 4) Ground water elevation and vertical gradient data for <br /> wells MW-9,MW-11,MW-13,MW-16,MW-17,MW-18 and Three B's TruckPlaza wells MW-6, <br />' MW-9 and MW-10 are depicted in cross section C-C' (Figure 3), ground water elevations were <br /> plotted for the informal First Zone, Second Zone, Secondary Aquifer Zone and Primary Aquifer <br /> Zone hydrogeologic flow units as defined in AGE's Final Remediation Plan (Figures 4, 5, 6 and 7, <br />' respectively) <br /> On 25, 26 and 27 June 2003, approximately 5 to 12 gallons of ground water (a minimum of three <br />' • casing-water volumes per well) were evacuated (purged) from wells MW-1 through MW-7 and <br /> MW-16 utilizing either disposable polyethylene bailers or submersible two-stage pumps, <br /> approximately 70 to 90 gallons of ground water were purged from wells EW-1 and EW-3 utilizing <br /> a two-stage submersible pump Temperature, pH and conductivity were measured for stabilization <br /> at regular purge-volume intervals from each well using an Oakton water analyzer Field data and logs <br /> are provided in Appendix G The purged ground water was transferred to the ground water <br /> remediation system holding tank for treatment and disposal <br />' Single-completion monitoring wel is MW-14,MW-15,MW-17,MW-18 and multi-level monitoring <br /> wells MW-8 through MW-13 were purged utilizing a Watera-Hydro-Lift II pump equipped with a <br /> mechanical arm by lowering and raising a 3/8-mch outer diameter, length-discrete polyethylene hose <br />' equipped with a ball-valve water tip through the top chambers into the specific water-charged <br /> screened section Approximately 211/2 to 293/4 gallons of ground water(a minimum of three casing- <br /> water volumes per well) were purged from the single-completion monitoring wells and <br /> approximately'/4 to 4%z gallons of groundwater were purged from the multi-level monitoring wells <br /> Temperature,pH and conductivity were measured for stabilization at regular purge-volume intervals <br /> from each well using an Oakton water analyzer Field data and logs are provided in Appendix G, <br /> purged ground water was transferred to the ground water remediation system holding tank for <br /> treatment and disposal <br /> IAdvanced GeoEnvlronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.