My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000679
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2900 - Site Mitigation Program
>
PR0522496
>
ARCHIVED REPORTS XR0000679
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 8:22:33 PM
Creation date
2/15/2019 3:51:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000679
RECORD_ID
PR0522496
PE
2957
FACILITY_ID
FA0015317
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95245
APN
05532024
CURRENT_STATUS
02
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 11 August 2003 <br /> i AGE-NC Project No 96-0232 <br /> Page 15 of 15 <br />' site's UST primary product lines and the UST sump not passing the annual `Lane and Leak Detector' <br /> test In January 2003 As a result of the `leaking lines', the Flag City Chevron upgraded the entire <br /> UST system (I a replacement of fuel dispensers and pans, product piping, secondary containment <br /> piping and UST sumps) during May 2003 Since then, the MTBE dissolved plume appears to have <br /> stabilized, MTBE concentrations In extraction well samples have showed steady declines since the <br /> peak In March 2003 <br /> i <br /> 6.0 RECOMMENDATIONS <br /> Based upon data collected from the site, AGE recommends <br /> • Continued quarterly ground water monitoring and sampling of monitoring wells MW-1 <br /> through MW-18 <br /> • Continued coordinated quarterly ground water monitoring and sampling events with Three <br /> B's Truck Plaza <br /> • Continued ground water extraction from wells EW-4 and EW-5, extraction wells EW-7, <br /> EW-8, EW-9 and EW-10 should be alternated Into the ground water extraction system <br /> • Additional Geoprobe soil borings for collection of grab ground water samples may be <br /> warranted between P-37 and MW-4,west and south of P-37 and north of P-38 to fully assess <br /> the extent of impacted ground water <br /> 7.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing In this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologlc <br /> conditions at the site for the purpose of this Investigation are made from a limited number of <br /> available data points(ground water samples), and subsurface conditions may vary away from these <br /> data points No other warranty,expressed or Implied,is made as to the professional interpretations, <br /> opinions and recommendations contained in this report <br /> Advanced GeoEnviranmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.