Laserfiche WebLink
October 21, 2015 <br /> Reference: Response to California Regional Water Quality Control Board, Central Valley <br /> Regional Letter dated June 15, 2015 and Request for Additional Methane and Soil <br /> Gas VOC Investigation <br /> SCHEDULE OF ACTIVITIES <br /> Stantec will begin scheduling the proposed activities following approval of this work plan by the <br /> RWQCB. Stantec anticipates that pre-field activities (permitting, notifications, and private utility <br /> locating) will take approximately one month to complete. Field activities are anticipated to take <br /> two days. Although the mobile lab will have preliminary data immediately following the <br /> investigation, final Laboratory analysis reports will be obtained approximately two weeks following <br /> field investigations. Stantec will submit the results report to the RWQCB approximately 1 month <br /> after receipt of the final data. <br /> 10 <br />