Laserfiche WebLink
M KLEINFELDER <br /> PROJECT SCHEDULE <br /> The proposed scope of work would be performed in accordance with the following approximate <br /> schedule. <br /> Approximate - Task <br /> Timeline <br /> Week 0-1 Formal workplan authorization provided by the county health department <br /> Week 1-2 Permittin ' <br /> Week 2-4 Field Work <br /> Week 4-6 Chemical Analysis <br /> Week 6-9 Report Preparation <br /> Week 9 Report submitted to the Client <br /> ' Kleinfelder has no control over the time required by a regulatory agency to review and approve a work plan or <br /> over the laboratory tum around time. <br /> 1 This excavation, transportation and disposal will be done by a subcontractor. Kleinfelder does not have control <br /> over scheduling or the progress of their field activities. <br /> CLIENT RESPONSIBILITIES AND ASSUMPTIONS <br /> This workplan is based on the following assumptions and responsibilities: <br /> ➢ This workplan will be adequate to obtain authorization from SJC/EHD. If an addendum or an <br /> additional work plan is necessary, additional charges for work plan preparation will be incurred. <br /> ➢ Adequate workspace and access will be provided. Kleinfelder will attempt to collect samples at <br /> the proposed locations. If the volume of contamination exceeds the estimated amount <br /> additional confirmation sampling and analyses may be required for either confirmation <br /> sampling and or for additional profiling for disposal purposes. <br /> ➢ This workplan is based on the presumption that Pegasus MH Ventures I, along with oversight <br /> from Chevron and PG&E will clearly mark private subsurface structures existing onsite in the <br /> footprint area to determine the location of existing structures, underground utilities and services. <br /> Pegasus MH Ventures I should be aware that penetrating the site's surface is inherently risky. It <br /> is impossible to determine with certainty the precise location of all structures which may be <br /> buried in the ground. Kleinfelder's fee is not adequate to compensate for both the performance <br /> of the services and the assumption of risk of damage to such structures. Disruption of utilities <br /> or damage to underground structures will be the responsibility of Pegasus MH Ventures I or <br /> those responsible for identifying the pipeline locations (Chevron or PG&E). Services rendered <br /> by Kleinfelder to repair them will be billed at cost. Underground Service Alert(USA) at 1-800- <br /> 642-2444 provides a partial location service free of charge for major utility lines. It is important <br /> that Pegasus MH Ventures I understand that subsurface utilities buried under private property <br /> will not be marked by the public utility companies contacted by USA. USA will be contracted <br /> at least 48 hours prior to performing field work. <br /> ➢ Backfill, compaction and compaction testing are not part of the proposed services. <br /> ➢ Based on preliminary information provided by RAH Environmental, Kleinfelder assumes the <br /> waste will be profiled as a non RCRA-hazardous waste and acceptable at Forward Landfill in <br /> 44943.T04/ST04RI 121 r Page 7 of 9 <br /> Copyright 2004,Kleinfelder,Inc. September 2,2004 <br />