My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012559
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0012559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:01:25 PM
Creation date
2/22/2019 1:52:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012559
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� }� �r `�j� 'q :t" ,� ���� ''"`' x.. is: ^+• tet. s : <br />�e� i - b , �s - ��w" .� 6jul'�`9. £ L�... > �I �s'e � •d'��� r `d 4-d � ,f*z•.- 1 <br /> ES ENGENEEFUN rSC1ENCE <br /> SECTION I <br /> INTRODUCTION <br /> 1.1 PURPOSE AND REQUIREMENTS <br /> The purpose of this safety plan is to establish personnel protection standards and <br /> mandatory safety practices and procedures. This plan assigns responsibilities, <br /> establishes standard operating procedures, and provides for contingencies that may <br /> arise :while operations are being conducted at Underground Storage Tanks (UST) <br /> sites. <br /> Tha provisions of the plan are mandatory for all on-site personnel. All ES <br /> personnel shall abide by this plan. Any supplemental plans used by subcontractors <br /> shall conforrr, to this plan as a minimum. All personnel who engage in project <br /> activities must be familiar with this plan and comply with its requirements. <br /> 1.2 SITE DESCRIPTION <br /> 1.2.1 Site Description t <br /> _- The Greyhound Stockton Terminal is loccated at 121 S. Center Street in y <br /> Stockton, California. The facility formerly had underground storage tanks <br /> iv <br /> containing diesel fuel and fuel service lines to bus ports that have sinze been <br /> removed. <br /> .� 13 SCOPE OF WORK <br /> Field tasks to be performed at.the Greyhound Terminal in Stockton, Calibrnia <br /> include the installation of b borings around the diesel fuel supply line. <br /> If additional problems are encountered,future tasks might also include collection <br /> ' of additional soil samples and groundwater and installation of additional wells. <br /> 1.4 PROJECT TEAM ORGANIZATION <br /> Table 1.1 describes the responsibilities of all on-site personnel associated with <br /> this project. The names of principal on-site personnel associated with this project, <br /> are delineated below: <br /> Project Manager: James <br /> Baker(Ea Syracuse) .; <br /> Field Team Leader: Richard Moravec(ES Syracuse) <br /> Site Health and Safety Officer. Richard Moravec(ES Syracuse ) <br /> Ali ES personnel have-beer'; appropriately trained in first aid, hazardous waste <br /> safety procedures including the operating and fitting of personal protective <br /> equipmcnt,and are experienced with the types of field operations to be employed at <br /> the Greyhound Stoclaon Terminal. <br /> KLt1 SY134.o9(1001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.