My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012559
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0012559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:01:25 PM
Creation date
2/22/2019 1:52:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012559
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,i � •�e�rr - �i �r <br /> z <br /> 5 <br /> afi <br /> safe working area. Drilffng should not be commenced when free • The operator of a drill rig should only apt-role a drill rig lion, the <br /> limbs, unstable ground or site obstructions cause unsafe tool han�lfng position of the controls. If the operator of the drill rig must icovL. <br /> conditions, the area of the controls, the operator should shift the fronsmissioii <br /> controlling the rotary drive into neutral and place the feed control F <br /> lever in neutral. The operator should shut down Ike drill engine be. <br /> 4. Start Up lore leaving the vicinity of the drill. q <br /> t , • All drill rig personnel and visitors should be instructed to "stand • Throwing or dropping tools should not be permitted. All tools <br /> clear" of the drill rig immediately prior :a"and during starling of an should be carefully passed by hand between personnel or a hoist fine <br /> engine. should be used. b <br /> • Make sure all gear boxes are in neutral, all hoist levers are dis- • Do not consume alcoholic beverages or other depressants or �-•'t�k. <br /> engaged, all hydraulic lavers are in the correct nonatluating positions <br /> chemical stimulants prior to starting work on o drill rig or while on <br /> the jab. <br /> 1 endnhe cathead rope is not on the earhead before starting a drill rig • li if is necessary to drill within on enclosed area, moke certain , <br /> 1 grs <br /> • that exhaust fumes are conducted our of the area. Exhaust fume; car, <br /> Start all engines according to the manufacturer's manual, <br /> be toxic and some cannot be detected by smell. ; <br /> I�' • Clean mud and grease Irom your boots bclore mounting a drill <br /> TSS] 10. Safety During Drilling Operations platform and use hand holds and railings. Watch for slippery ground a"+ <br /> what dismounting from the platform, <br /> O Safely requires the attention and cooperation of every worker and <br /> 541 • During peering weather, do not touch any metal pmts of the drill , <br /> site visitor. <br /> t • Dnot drive the drill rig from hole to hole with the mast(derrick) rig with exposed flesh. Freezing of moist skin to metal can occur al• <br /> most instantaneously. <br /> in the raised position. • All air and water lines and pumps should be drained when no; ,rt <br /> • Before raising the most (derrick) look up to check for overhead <br /> use if freezing weotf.er is expected, , <br /> n obstructions, (Refer to Section 11 ori Overhead ane,Buried Utilities.) • All unattended boreholes must be adequately coveted or other. <br /> • Drf,wr toWisil Ih•mnsl (deiiirl.l, .ill drill rig persenne(tuiih ex. r <br /> Mise protected to prevent drill rig personnel, site visitors or animals <br /> teplion of the opeiatoi) and visitors should be cleared Isom the meas <br /> from stepping or failing into the hole. All open boreholes should be `y <br /> irnmedialely to the rear and the sides of the most. All drill rig person- covered, prolacted of 6atkfified adequately and according ra local or - <br /> nel and visitors should be Informed that the most 'is being raised prior stole regulations on csmplelion of the drilling project. <br /> to raising it, <br /> • Before the most (derrick) of o drill rig is raised and drilling is • "Horsing around" within the vicinity of the drill rig and tool and <br /> - � 6fFra�' <br /> supply storage areas should never be allowed, even when the drill A P; <br /> commenced,, the drill rig must be first 'reveled and stabilized with rig is shut down. <br /> leveling locks and/or solid cribbing. The drill rig should be relevel• '. <br /> • When using o ladder ono drill rig, face the fodder and gra;p ,pa <br /> rd if it settles after initial set up. Lower the most (derric0 only either the side rails or the rungs with bath hands while ascending or =" <br /> when the leveling lacks are down and do not raise the leveling (ae descending. Do not allempt to use one or both hands to cmrr n fool <br /> r <br /> podi until the most (derrick) is Powered completely. <br /> while on a ladder. Use a hoist line and a fool "bucket" .r a safety <br /> • Belpre starting drilling operations, secure and/or lack the mass � <br /> hook fa raise or lower hand tools, fil, <br /> (derrick) if required according la the drill mfinufacimer's recommenda• Ali elevated derrick platform should be used with the following <br /> precautions: <br /> �1t_ -11- a <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.