Laserfiche WebLink
AN4 <br /> t,* tx,�"", ter' a ,ie•. (Fo-y � � M,.&. Ff...�+e� _°;� .r3q 5��,_ i, �3 "� <br /> P <br /> f i <br /> SEC:_..:3 5 <br /> AccZZENT 2REVr__gTI7:i AND C::IT=TG1:.dCY ° <br /> LAN <br /> - ; 1 ACCI=MT PREVVIi-TC, <br /> All 'field personnel will receive health and safety training prior <br /> fco <br /> to tate initiation of any site aetivitiss- OC a Cay- -day basis, <br /> individual parscnnol should ba constantly alert `or Lndscators of poten- <br /> tiaLly hazardous situatioris and for signs and symptoms in themselves and <br /> others that warn of hazardous candit-ions and exposures. Rapid recog- <br /> nition of dangerous 91tuauona can avert an emarge tey• Before doily <br /> .cork assignments, regular ^+eetiags should be hold. ntscussion should <br /> _zelude: <br /> o .asks to*be Performed. <br /> o Time canszraintn (e.g., root breaks, cartridge changes). <br /> o Hazards that may be encountered, including their effects, haw <br /> to recog:->ize symptoms or monitor them. concentration limits. or <br /> other danger signals. <br /> O emergency procedures. <br /> 5.1.1 orillinc <br /> prior to any drillinq activity efforts should be nada to determine <br /> ' whether underground insts,la"Qns will be encountered and, if so, where <br /> � = these installations are located. Hard hats and safety blocs must as a <br /> � + minimum be worn withi,li 50 Leet of the drill rig. The drilling riq <br /> cannot be operated Within 10 feet of power lines. The Ftald Team Lead" <br /> M or Site Safety officer will provide constant cn-aita supervisiuz of the <br /> drilling subcontractor to ensura that they are meeting the health and <br /> + ' work will be Stapp" <br /> safety requirements. tf do?i,ciancies are noted. <br /> A• <br /> and corrective action will be talon (e.g., retrain, purchase additional <br /> safety equipm"nt). Reports of health and safety deficiencies and the <br /> carrective action taken will be forwarded to the project manager- <br /> .'. R.1 <br />