Laserfiche WebLink
Power line will be when the most is raised and/or being raised. Do <br /> not raise the matt or operate the drill rig it this distance is fess Ilion <br /> 20 ft. (6 m), or if known, the minimum clearance stipulated 6y federal, <br /> ii slate and local regulal-ons. <br /> I • Keep in mind that 6oih hoist lines and overhead power lines can <br /> I �7 be moved toward each other by the wiled. <br /> V e In order to ovoid contact with power lines, only move the drill <br /> rig will the mast (derrick( down. <br /> e If there are any questions whatever concerning the solely of drill. <br /> F , <br /> i ing on sites in the vicinity of overhead power lines, toll the power ,r <br /> company. The power company will provide expert advice at the drill. <br /> Ing site as a public service and at no cost, <br /> UNDERGROUND <br /> Underground electricity is as dangerous as overhead electricity, <br /> CABLEBe aware and always suspect the exislance of underground utilities t <br /> such as electrical power, gas, petroleum, lelepl-.?ne, sewer and water. <br /> BEFORE DIGGING PLEASE Ask for assistance: <br /> CALL ENTERPRISE 9800 o If a sign warning of underground utilities is located on a site <br /> boundary, do not assume that underground ulililies are located on or <br /> W C near The boundary or properly fine under the sign: toll the utility and f <br /> GWS' check it out. The underground utilities may be o considerable dis• <br /> lance away from the warning sign. <br /> e Always contact the owners of utility lines or the neatest under, <br /> ground utility location service before drilling. Determine jointly with <br /> utility personnel the precise location of underground utility lines, <br /> mark and flog the locations and determine jointly with utility person• <br /> net what specific precautions crust be taken to assure safety. <br /> 12. Safe Use Of e=lectricity <br /> Drilling projects sometimes require oround•Ilie•clocI, operations <br /> and, therefore, require temporary electrical lighting. In general, oil <br /> • Watch for sagging power lines before entering a site. Do not lift "'ting and fixtures used to provide electricity for drilling operations <br /> Power lines to gain entrance. Call the utility and ask them to lift or should be installed by qualified personnel in accordance with lite <br /> raise The lines or deenergize(turn off) the power. National Electrical Code (NFPA70-1994) with consideration of the <br /> • Before raising the drill rig mast (derriek) on a site in the vicinity <br /> American Petroleum Instisuta's recommended practices for electrical <br /> of power lines, walk cornplelely around the drill rig. Determine what installations for production facilities(API-RP-500B). Lights should <br /> the minimum distance from any point on the drill rig to the nearest be instal(?d and positioned to assure that the work area and operating <br /> -71 <br />