Laserfiche WebLink
MARCH 1993 <br /> QUARTERLY STATUS REPORT {CONTINUED} <br /> • Timelines for activities currently underway or proposed: <br /> Greyhound will continue the monthly groundwater monitoring and quarterly <br /> groundwater sampling programs in accordance with all applicable LUFT and <br /> Tri-Regional requirements Our next sampling event will be conducted during <br /> the month of June 1993 Mr Michael Infurna (EHD) will be notified at least <br /> one week prior to the sampling event so that an EHD representative can be on <br /> site during the sampling A quarterly status report will be prepared and <br /> submitted to the EHD on or before July 17, 1993. An evaluation of the data <br /> obtained from these programs will be made in June 1993 to determine whether <br /> further action is required at the site <br /> GLI implemented the supplemental site investigation during the week of <br /> January 18, 1993 A Soil Remediation Plan will be submitted after EHD <br /> review of the supplemental site assessment report which will be submitted to <br /> EHD no later than April 34, 1993 <br /> • Estimates of the quantity of contamination remaining in soil and <br /> groundwater, and time for completing remediation: <br /> The quantity of soil and extent of groundwater contamination including the time <br /> required to remediate this site will be carefully evaluated in the Soil <br /> Remediation Plan At the present time, it is clear that groundwater has not been <br /> impacted at this location based on analytical data collected to date <br /> LMLISY360 2210021 REV 3 <br /> 5 <br />