My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000638
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0000638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:41:16 PM
Creation date
2/22/2019 2:12:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000638
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ir-"- r-i r—i r-t r-) 17 to-1 r n (' 'l , 117"1, r�l Ilii fi it""I. <br /> ke determined jointly by the management of the drilling organiza- 5. Housekeeping On and Around the Drill Rig <br /> 4ian and the safety supervisor.Such equipment might include <br /> face or ear protection or reflective clothing. Each drill rig worker The first requirement for safe field operations is that the <br /> must wear noise reducing ear protectors when appropriate. safety the responsibility for <br /> maintenance and"housekeeping" <br /> on and understand and laround the drill rig.The <br /> safety supervisor must: <br /> • Provide suitable storage locations for all tools,materials,and <br /> supplies so that these items can be conveniently and safely <br /> handled without hitting or falling on a member of the drill crew <br /> e or a visitor. <br /> a • Avoid storing or transporting tools, materials, or supplies <br /> e within or on the mast(derrick)of the drill rig,unless designed for <br /> o this purpose. <br /> o • Stack pipe,drill rods,casing,augers,and similar drilling tools <br /> b in orderly fashion on racks or sills to prevent spreading, rolling, <br /> or sliding. <br /> • Place penetration or other driving hammers at a safe loca- <br /> tion on the ground or secure them to prevent movement when <br /> not in use. <br /> • Keep work areas,platforms,walkways,scaffolding,and other <br /> accessways free of materials, debris, obstructions, and <br /> substances such as ice,grease or oil that could cause a surface <br /> to become slick or otherwise hazardous. <br /> • Keep all controls, control linkages,warning and operation <br /> lights and lenses free of oil, grease, and/or ice. <br /> Store gasoline only in a non-sparking, red container with a <br /> flame arrester in the fill spout and having the word "gasoline" <br /> easily visible. <br /> 6. Maintenance <br /> Good maintenance will make drilling operations safer. Also, <br /> maintenance must be performed safely.The following points are <br /> essential to safety: <br /> When drilling is performed in chemically or radiologically con- • Wear safety glasses when performing maintenance on a drill <br /> taminated ground, special protective equipment and clothing rig or on drilling tools. <br /> may,and probably will,be required.The design and composition • Shutdown the drill rig engine to make repairs or adjustments <br /> of the protective equipment and clothing must be determined to a drill rig or to lubricate fittings(except repairs or adjustments <br /> jointly by the management and the client who requests the drill- that can only be made with the engine running).Take precautions <br /> ing services,and under some circumstances,with the concur- to prevent accidental starting of an engine during maintenance <br /> rence of a health and safety professional. by removing or tagging the ignition key. <br /> 11 -12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.