My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000638
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
3500 - Local Oversight Program
>
PR0544166
>
ARCHIVED REPORTS XR0000638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:41:16 PM
Creation date
2/22/2019 2:12:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000638
RECORD_ID
PR0544166
PE
3528
FACILITY_ID
FA0005252
FACILITY_NAME
GREYHOUND LINES INC
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730011
CURRENT_STATUS
02
SITE_LOCATION
121 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. to the derrick, must beless than 6 tt.(2 m)tong. I ne saC�,r, belt <br /> controlling the rotary drive Into neutraland place the feed lever and lifeline must be strong enough to withstand the dynamic <br /> in neutral. Before leaving the vicinity of the drill, shut down the force of a 250 Ib. (115 kg)weight(contained within the belt)fall- <br /> drill engine. <br /> • Throwing or dropping tools must not be permitted.Carefully ing 6 (2 m). <br /> pass tools by hand between personnel or use a hoist line. Use a safety device when climbing to a derrick platform that <br /> i <br /> • Do not consume alcoholic beverages,other depressants,or :higher than 20 ft. (6 m). <br /> When an a derrick platform,fasten the lifeline to the derrick <br /> chemical stimulants prior to starting work on a drill rigor while just above the derrick platform and to a structural member that <br /> on the job. is not attached to the platform onto other lines or cables support- <br /> * If it is necessary to drill within an enclosed area, make cer- ing the platform. <br /> tain that exhaust fumes are conducted out of the area. Exhaust . When first arriving at a derrick platform,immediately inspect <br /> fumes are toxic and some cannot be detected by smell. for broken members, loose connections, loose tools, or other <br /> • Clean mud and grease from boots before stepping on a drill loose materials. <br /> platform and use hand holds and railings. Watch for slippery . Securely attach tools to the platform with safety lines. Do not <br /> ground when stepping down from the platform. attach a tool to a line attached to one's wrist or any other part of <br /> • During freezing weather,do not touch any metal parts of the the body. <br /> drill rig with exposed flesh. Freezing of moist skin to metal can • When working on a derrick platform,do not guide drill rods <br /> occur almost instantaneously. or pipe into racks or other supports by taking hold of a moving <br /> • Drain all air and water lines and pumps when not in use if hoist line or a traveling block. <br /> freezing weather is expected. • Do not leave loose tools and similar items on the derrick plat- <br /> e Adequately cover or protect all unattended boreholes to pre- form or on structural members of the derrick. <br /> vent drill rig personnel,site visitors,or animals from stepping or q derrick platform over #t.(1.2 ma above ground surface must <br /> failing into the hole.Cover, protect or backfill all open boreholes have toe boards and safety railing that are In good condition. <br /> according to local or state regulations on completion of the drill- . Avoid being under rig workers on elevated platforms <br /> ing project. whenever possible. <br /> • Never allow"horsing around" within the vicinity of the drill <br /> rig and tool and supply storage areas — even when the drill rig If heavy objects must be manually lifted, exercise care to <br /> Is shut down. <br /> • When using a ladder on a drill rig,face the ladder and grasp avoid injury. <br /> • Before lifting an object without using a hoist,make sure that <br /> either the side rails or the rungs with both hands while ascend- <br /> the load is within your personal lifting capacity. if it is too heavy, <br /> ing or descending. Do not attempt to use one or both hands to <br /> ask for assistance. <br /> carry a tool while on a ladder.Use a hoist line and a tool "bucket" <br /> • Before lifting a relatively heavy object,approach the object <br /> or a safety hook to raise or lower hand tools. <br /> by bending at the knees,keeping the back vertical and unarched <br /> • Terminate drilling operations during an electrical storm and <br /> move the complete crew away from the drill rig. while obtaining a firm footing.Grasp the object firmly with both <br /> hands and stand slowly and squarely while keeping the back ver- <br /> tical and unarched. In other words, perform the lifting with the <br /> An elevated derrick platform should be used with the follow muscles in the legs, not with the muscles in the lower back. <br /> ing precautions: <br /> • When working on a derrick platform, use a safety belt and • If a heavy object must be moved some distance without the <br /> a lifeline. The safety belt must be at least 4 in. (100 mm) wide aid of machinery,keep the back straight and unarched.Change <br /> and should fit snugly but comfortably.The lifeline,when attached <br /> directions by moving the feet, not by twisting the body. <br /> 413- <br /> -17- <br />
The URL can be used to link to this page
Your browser does not support the video tag.