Laserfiche WebLink
�� ,�,� _�-_�..: .. ...�.� _- .v �•----.�. .�.�........�....�.�f-�-�... �............. .-T ter. T .. ...-..r...« - »�... �. �. �...�... ��.. :-... � :+.r.- .... ,rte <br /> r-i, rn r—i r-1. rn. t�7-, r-i. r-i. r-i. rn. ir-i, r7, r-1, <br /> lighted without shadows or blind spots. The followh,�,, are <br /> to the nearest power line when the mast is raised and/or being specific recommendations for land-based drilling operations: <br /> raised. If this horizontal distance is less than 100 ft.(30 m),first <br /> consult the local utility company and refer to OSHA REG 29 CFR <br /> 1910.180 before commencing operations. <br /> • Keep in mind that both hoist lines and overhead power lines <br /> can be moved toward each other by the wind. <br /> • In order to avoid contact with power lines,only move the drill <br /> rig with the mast (derrick)down. <br /> • If there are any questions concerning the safety of drilling <br /> on sites in the vicinity of overhead power lines, call the power <br /> company.The powercompany will provide expert advice at the <br /> drilling site as a public service and at no cost. <br /> Electricity is as dangerous underground as overhead. Be ON <br /> aware of and always suspect the existence of underground <br /> utilities such as electrical power, gas, petroleum, telephone, <br /> sewer and water. <br /> • If a sign warning of underground utilities is located on a site <br /> boundary,do not assume that underground utilities are located ° <br /> on or near the boundary or property line under the sign.Call the <br /> utility and check it out.The underground utilities may be a con- <br /> siderable distance away from the warning sign. _ <br /> • Always contact the owners of utility lines or the nearest OFF <br /> underground utility location service before drilling. Determine <br /> jointly with uiiiity personnel the precise location of underground <br /> utility lines, mark and flag the locations, and determine jointly <br /> with utility personnel what specific precautions must be taken <br /> to ensure safety. <br /> 12. Supplying Power to the Job Site <br /> Drilling projects sometimes require around-the-clock opera- <br /> tions and, therefore, require temporary electrical lighting. In <br /> general,all wiring and fixtures used to provide electricity fordrill- Before working on an electrical power or lighting system, <br /> Ing operations should be installed by qualified personnel in lock-out the main panel box with your own lock and keep the key <br /> accordance with the National Electrical Code(N FPA70-1984)with on your person at all times. <br /> consideration of the American Petroleum Institute's recom- • Install all wiring using high quality connections,fixtures and <br /> mended practices for electrical installations for production wire. Be sure that the wiring is insulated and protected with <br /> facilities (API-RP-500B). Lights should be installed and posi- consideration for the drilling environment. Do not use makeshift <br /> tioned so that the work area and operating positions are well <br /> -22- <br /> -21- <br />