Mr. .Snyder <br /> April 23, 1990 <br /> Page 3 <br /> Excavated soils will be stockpiled on site pending either on-site <br /> treatment or legal, off-site disposal. The estimated volume of <br /> excavated soils is projected at 14 cubic yards from the fuel- <br /> storage tank pit and the piping trench and 10 cubic yards from <br /> the former waste-oil tank pit. <br /> Once the samples have been collected from each of the <br /> W <br /> P <br /> excavations, the excavation pits will be!zackfilled, compacted <br /> and resurfaced so the station can resume operations. Groundwater <br /> Technology will then prepare an additional work plan based on the <br /> i <br /> data gathered. The work plan will address the status of the non <br /> excavated soils and groundwater beneath this site with regards to <br /> potential or discovered impacts by gasoline hydrocarbons. <br /> Chevronwouldlike to reopen..this stationas soon as possible. As <br /> such, anything that can be done to expedite the review process <br /> would be appreciated. If you have any questions or require any <br /> additional information, please contact our office in Concord, <br /> California. <br /> Sincerely, + <br /> GROUNDWATER -'TECHNOLOGY, INC. <br /> Glen L. Mitchel <br /> Assessment G .-up nager <br /> RED GEp! <br /> sro <br /> Alen B. S �``' �y`f'•� <br /> Registered G ologist No.4394 <br /> No. 4394 Exp. :!D0 ' <br /> GLM:ABS: lbm Q <br /> L3 2 91B.GM �lglF OF CAO,F���\ <br /> DOW GROUNDWATER <br /> ❑❑❑ TECHNOLOGY,INC. <br />