My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. <br /> NPDES NO. CA0081787 <br /> FOR <br /> THE MARLEY COOLING TOWER COMPANY <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> EFFLUENT MONITORING <br /> Effluent samples shall be collected in the North Yard pipeline that conveys <br /> effluent to the Stockton Diverting Canal . Effluent samples should be repre- <br /> sentative of the volume and nature of the discharge. Time of collection of a <br /> grab sample shall be recorded. The following shall constitute the effluent <br /> monitoring program: <br /> Constituents Units Type of Sample SamplingFrequency <br /> Total Chromium mg/l Grab *Once per week <br /> Hexavalent Chromium mg/l Grab *Once per week <br /> Arsenic <br /> Copper mg/1 Grab *Once per week <br /> PP mg/l Grab *Once per week <br /> Specific Conductivity umhos/cm Grab *Once per week <br /> pH ph Units Grab *Once per week <br /> Flow mgd Cumulative Continuous <br /> Bioassay % Survival Grab Once per year <br /> Priority Pollutant Scan ug/l** Grab Once per year <br /> A visual inspection of the chromium monitor, the conductivity monitor, and <br /> the treatment system shall be performed daily when the treatment system is in <br /> operation. <br /> * During the first 24 hours of a storm-induced discharge from the treatment <br /> system, three samples shall be collected at 8-hour intervals and composi- <br /> ted. After this 24-hour period, samples shall be collected once per <br /> week. <br /> ** Or Method Detection Limit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.