My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule Name: MARLEY COOLING TONER COMPANY <br /> Project Manager: D.N. BATES <br /> As of date: 12-Oec-88 9:09aa Schedule File: C:\TLDATA\SCHEDULE <br /> FIRST ATTEMPT FOR OVERALL SCHEDULE FOR CLEAN UP AT STDCKTON PLANT <br /> 87 Be <br /> Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct <br /> Who Status 2 2 2 1 1 1 1 3 1 1 2 1 4 1 1 1 2 1 1 1 1 <br /> ISEMERAL CONSTRUCTION ++++++++++++++r+ <br /> IPILOT TEST PROS DEVELOPMENT 0 M . <br /> (PILOT TEST PROGRAM ++++ <br /> IEDUIPMENT REDESIGN 1 <br /> (EXCHANGER INSTALLATION <br /> iSECONDARY CONTAINMENT REVIEW <br /> ITANK CONSTRUCTION <br /> IEFFLUENT FORCE MAIN CONSTRUCT ++++++++-------- <br /> iP,ECOVERY TANK DESIGN REVISION +++ <br /> IRECOVERY TANK CONSTRUCTION .----_-- --- <br /> [STARTUP TREATMENT PLANT I M-----------------------------------------------------__- <br /> [STARTUP AND TESTIN6 =- . . . . . . . . . . . . . <br /> 1TREATMENT PLANT OPERATIONAL I M----------------------------------------------------- <br /> 2PONO CLOSURE PLAN REVIEW-A ++++++, , <br /> 2PONB CLOSURE PLAN REVISIONS I _ <br /> 2P9N0 CLOSURE PLAN REVIEW-8 i __------_ <br /> 2POND LIDUID REMOVAL 1v <br /> ,'POND BOTTOM SAMPLING 1 __ .. <br /> ZPOND STABILIZATION CONTRACT I <br /> 2PONO STABILIZATION I <br /> 2POND EARTHWORK AND PAVING DOC <br /> 2POND FILLING <br /> 'CAP INSTALLATION <br /> 2PUMP STATION MODIFICATION -___---- <br /> 2PERIMETER DRAIN INSTALLA71ON 1 <br /> 2DRAINAGE CONTROL CONSTRUCTION 1 <br /> 2CERTIFICATION INSPECTION - <br /> 2PON0 CLOSURE COMPLETE I M----------------- <br /> 2STORM WATER SHAKEDOWN I <br /> 2STORM WATER OPERATION.COMMENC - I ,M_-_________»___________________—____-------------- <br /> 3NPDES PERMIT MODIFICATIONS <br /> 3NPDES PERMIT REVIEW AND APPRD - <br /> 3PHASE III WELL INSTALLATION 0 M . .. <br /> 3EXTRACTION WELL INSTALLATION =-----. <br /> 3GROUND WATER FORCE MAIN DESI6 <br /> 3GROUND WATER FORCE MAIN INSTN <br /> 38ROUN0 NATER SHAKEDOWN 1 <br /> 3PHASE III REPORT PREPARATION ---------------- - <br /> 3PHASE III REPORT REVIEW I __=_________________ <br /> 3GROUND WATER OPERATION CORNER I .M----------------------------------- <br /> 4WORK PLAN UPDATE C ++++ <br /> 4WORK PLAN APPROVAL C I <br /> 4SOUTH YARD SAMPLING C i <br /> 4SOILS ASSESSMENT REPORT PREP C I <br /> 4SOILS ASSESSMENT REPORT REVIE C I <br /> 4ASSESS. PROGRAM REPORTS APPRO C I X . <br /> 4FINAL MITIGATION PLAN PREFAB C I •_______ <br /> 4MITISATION PLAN REVIEW C <br /> 4MITIGATION PLAN APPROVED I N----------- <br /> 4MITIGATION PLAN IMPLEMENTATIO C I ___=-=____== <br /> ------------------------------------------- ---------------------------------------------------------------------------------------------- <br /> 0 Done -_= Task - Slack tie 1==---I, or <br /> C Critical ++• Started task Resource delay I--==1 <br /> A Resource conflict M Milestone ? Conflict <br /> p Partial dependency <br /> Scale: Each character equals 1 week <br /> -----------------------_..--------------------.----------_ ---------------------- ----------------------------------------------------- <br /> TIME LINE Gantt Chart Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.