My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 5:04:55 PM
Creation date
2/22/2019 2:32:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/Mission. Kansas 66202/Telephone: (913)362-1818 <br /> November 5 , 1986 <br /> Mr. Kent Zenobia , P . E . <br /> J . H . Kleinfelder & Assoc . <br /> 9795 Business Park Drive <br /> Suite A <br /> Sacramento , CA 95827 <br /> SUB : Surface Water Test . <br /> Dear Kent , <br /> We would like to redo the surface water test after the next <br /> rainfall . However , we want to make the following changes : <br /> ( 1 ) Take an additional sample at location "F" <br /> shown on the map . This is in the ditch <br /> south of the plant on Sinclair . <br /> (2) Split the sample at "A" and send test <br /> sample to California Analytical Laboratories . <br /> (3) Split sample "B" and label second sample <br /> "G" . Send both samples to Canonie . <br /> (4) Catch an uncontaminated rain water sample - <br /> I will ask Tom Peterson , our Plant Engineer, <br /> to start this when rainfall begins . <br /> Other than these changes the test should be run the same as <br /> the first test which was run on September 24 , 1986 . <br /> Please advise Tom Peterson who he should contact and Tom <br /> will initiate test when there is sufficient rainfall to generate <br /> adequate run-off for the test. <br /> Sincerely , <br /> THE MARLEY COOLING TOWER . COMPANY <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB :mhr MARLEY <br /> Enclosure -� <br /> cc : Tom Peterson-Plant Engineer , Stockton , MCTC _ <br /> A MARLEY COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.