Laserfiche WebLink
Note- <br /> All water and soil analyses performed pursuant to <br /> the subject workplan must be performed in <br /> accordance with the most recent edition of the <br /> referenced standard or analytical method. <br /> Page 4-10 Paragraph 4 . 1 . 3 ( Storm Water Sampling) ; <br /> Revise sampling scheme to include sampling of any <br /> runoff which drains into ditches along Dawes, Carrol , <br /> Coolidge, and/or Wagner Avenue. <br /> Note- <br /> Analytical program for all storm water runoff <br /> samples must include determination of zinc <br /> concentrations . <br /> Page 5-2 Saturated Subsurface Soil and Groundwater Mitigation <br /> Objectives; <br /> Delete objective # 1 ; The intent of remedial action <br /> is to eliminate any threat or potential threat to <br /> public health and the environment , and to comply <br /> with state laws regarding potential future <br /> beneficial use of the groundwater resource. <br /> Page 6-2 Second paragraph; <br /> It is premature to commit to the preparation of a <br /> negative declaration. Revise paragraph to specify <br /> that upon completion of the initial study ( IS) and <br /> based on the IS, either a negative declaration or an <br /> __ environmental impact report (EIR) will be prepared. <br />