My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule Name: Work Plan Schedule of <br /> Project Manager: David W. Dates <br /> As of date: 5-Seo-88 11:45am Sc <br /> This is a selective ieoort. All items <br /> t Notes (2) contains 'POND, <br /> 88 92 <br /> Jul Jul Aug Sea Oct Nov Dec Jan Feb <br /> W Status 1 1 1 3 1 1 2 2 3 <br /> POND CLOSURE D <br /> Pond Preparation Plan Dev. <br /> CA Pond Pre o. Plan Review <br /> Pub, Prep. Flan Comments <br /> Pond Prep. Implementation <br /> Pond Preparation Complete <br /> Draft Eng. & Env. Analvsis D <br /> CA Analysis Review D <br /> Modified W.E.T. Data C <br /> Soil Characteristics Data C <br /> Arsenic Reanalyses OC <br /> Final Eno. & Env. Analysis PC <br /> Closure Plan Revisions OC <br /> CA Closure Plan Review C <br /> Pub. Closure Plan Comments <br /> EPA Closure Plan Review <br /> Closure Design C <br /> CA Closure Design Review C <br /> Final Design Modifications C <br /> Closure implementation C <br /> POND CLOSURE COMPLETE <br /> ------------------------------------------------------------------------ <br /> D Done == Task <br /> C Critical +++ Started to <br /> R Resource conflict M Milestone <br /> p Partial dependency <br /> Scale: Each character eouals i week <br /> ------------------------------------------------------------------------ <br /> TIME LINE Gantt Chart Report Strip 1, Paoe 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.