My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -2- <br /> THE MARLEY COOLING TOWER COMPANY <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> b. Construction of covered storage facilities for treated wuod to prevent <br /> contact with stormwater; and <br /> c. Discontinued use of arsenic compounds in wood treatment solutions. <br /> 8. Past use of copper, chromium, and arsenic wood treatment compounds has <br /> resulted in contamination of soils and ground water underlying the site. <br /> First ground water is approximately 4U feet below ground surface. The <br /> contamination sources are the Retort Pit and Stormwater Retention Pond (no <br /> longer in use) , identified in Attachment B. Soils have been contaminated <br /> with copper, chromium, and arsenic; ground water ras been contaminated with <br /> chromium and copper only. A ground water contamination plume exceeding the <br /> Drinking Water Standard of 50 ug/l for chromium, extends off-site threatening <br /> local domestic supplies. <br /> 9. The Board, on 28 November 1984, ratified a Settlement Agreement between the <br /> Department of Health Services, the Discharger, and the Board, which requires <br /> the Discharger to define the extent of contamination, develop a mitigation <br /> plan, and implement all measures necessary to remediate existing site <br /> contamination. The Discharger is performing these tasks in accordance with <br /> the Agreement. <br /> 10. As part of the mitigation measures, the Discharger proposes to pump and <br /> discharge ground water from beneath the site to the on-site treatment plant <br /> before discharge. <br /> 11. The Report of Waste Discharge describes the combined stormwater and ground <br /> water characteristics prior to treatment as follows: <br /> Average Flow: 0.37 million gallons per day (mgd) <br /> Design Flow : 0.370 million gallons per day (mgd) <br /> Average Temperature: storm water - ambient <br /> ground water - 68°F <br /> Constituent Stormwater (mg/1 ) Ground Water (mg/1 ) <br /> Total Chromium 5.0 2U.0 <br /> Chromium VI 4.5 20.0 <br /> Copper 4.34 <0.05 <br /> Arsenic 0.04 <O.01 <br /> 12. Both stormwater and ground water will be treated at an on-site treatment <br /> plant constructed and operated by the Discharger. Treatment consists of <br /> flow equalization, settling, filtration, pH adjustment, and ion exchange. <br />
The URL can be used to link to this page
Your browser does not support the video tag.