My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY � � ^� `� o <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362.1818 4 <br /> EN141ROMENTAL <br /> HEALTH <br /> ER v1IT/SERV CES <br /> F <br /> July 7 , 1988 <br /> Mr. Jim Aus ng <br /> Dep rtmen of H lth Services <br /> Tox c Su stances trol Division <br /> 4, Po er Inn Road <br /> Sacr nto, California 95826 <br /> Dear Mr. Austreng: <br /> To expedite completion of remediation of the Stormwater <br /> Retention Pond, The Marley Cooling Tower Company intends to <br /> initiate final closure activities as quickly as possible. As <br /> required by the Remedial Action Order, additional characteri- <br /> zation samples have been gathered and preliminary analytical <br /> results are currently being evaluated. Certain data gaps have <br /> been determined as needing to be addressed to complete characteri- <br /> zation of the Pond. Through an Engineering and Environmental <br /> Analysis of alternatives ( as suggested by General Requirement <br /> 3 .0 of Exhibit E) we intend to show that closure of the Pond <br /> with waste materials remaining in the Pond will meet short-term <br /> and long-term effectiveness criteria for public health and <br /> environmental protection as well as other applicable or relevant <br /> and appropriate requirements. <br /> The available groundwater data show that only hexavalent <br /> chromium has impacted the groundwater. Although monitoring <br /> wells have not been routinely analyzed for copper and arsenic, <br /> three of the wells on the site were analyzed in January 1988 <br /> for these constituents . Extremely low detection limits were <br /> used for these analyses. The results obtained were as follows <br /> ( chromium concentration ranges are from the Phase III Ground- <br /> water Assessment Report) : <br /> MARL/Er <br /> the 4 <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.