Laserfiche WebLink
Page 2 Cont. <br /> C. Quarterly Lysimeter Samples <br /> 1. Attached are the results of the analysis of the <br /> lysimeter samples taken on February 26, 1988 . <br /> 2 . Additional samples were taken in May but we have <br /> not received the report at this time. <br /> 3 . The next round of lysimeter samples will be taken <br /> during the week of July 11, 1988 . <br /> D. South Yard Storm Water Runoff Evaluation <br /> The technical report for the South Yard stormwater <br /> runoff required by the NPDES permit was submitted on <br /> May 31, 1988 . <br /> E. Samples Around North Yard <br /> The four ( 4 ) samples added to the Work Plan (J. T. <br /> Allen' s letter of April 29 , 1988 , Attachment "B" , <br /> Page 4-1, Section 4 . 1. 1) along the East fence, to <br /> groundwater will be taken the week of June 6, 1988 . <br /> Please advise if you have any questions. <br /> Sincerely, <br /> HE MARLEY COOLING TOWER COMPANY <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> Attachment <br /> cc ' s: Charles White-DOHS Van Siebal-DOHS <br /> Ronald Valinoti-SJEHD Gary Reents-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Terry Hart-MCTC Tom Hickey-Black & Veatch <br /> Hal Daley-Stockton File <br />