Laserfiche WebLink
Attachment A <br /> April 29, 1988 <br /> M✓i a n1 o r a n d u ni <br /> IER QUALITY CONTRO: 50ARD • CENTRAL VALLEY REGIO <br /> Se ,;rn., 9c.b`t--�OaB Phone: (916) 361-5801 <br /> - - ------- ATSS' 8.495.5601 <br /> i t�nl K. J. Vo, >tcr FROM: <br /> Gary A. Reents P.E. <br /> �roJect Engineer <br /> '-u, 11 lSuo SIGNATURE; _ <br /> MAXILI.' (.601 INC, (OWLk COHPANY. SURFACE IMPOUNDMENT CLOSURE AND <br /> PUSf-CIOSURL PIAN AND CURRENT WORK PLAN, SAN JONUIN COUNTY <br /> 1'i6atch E-191 'ioars submittud the subject reports <br /> 1 , doted 14 and 15 March <br /> 'eH8 r65yvcttv�ly, c.n behalf of Marley. Both are revisions of previous <br /> n,ta Detny submitted in response to the Department of Health Service's <br /> i rCP. ;L kc;iW-dial Action Order. <br /> The Closure/Post-Closure Plan contains procedures for both interim and final,; <br /> Closure of the storm water pond. The Workplan contains $P0cifiC acti0ns*for- <br /> `11"Itl0r,a1 soii and ground water sampling previously proposed, and general <br /> Q..Llvitii for cGmpletion of the RerrIedial Investigation and Feasibility Study. <br /> F1, corn w„t: rC941Lling tht respective Plans are as follows: <br /> Clt,surr/Ft._t-Cra ore Plan <br /> T agree wits' trio iratement$ in the Plan that final closure activities cannot be <br /> .,et�rm L,rd until Pond sampling has been completed. If, after sampling results <br /> have be,:,, r„vizweJ. It is decided to leave hazardous or designated wastes (Class <br /> , l <br /> iscarge to et <br /> Sub:,haptar15rcquirlcmbntS. Ats`hatttirns,pwetwill Of Wreview aste Dthehfinal Closure <br /> drtalis arid draft waste discharge requirements. It appropriate. It should be <br /> nu*ed th:A the legal requirements regarding Citing for in-place Closure (SCtio <br /> n <br /> r5Oz ( u) ( 2► , Sube <br /> charrter 15, Title 23. CCR) may be difficult to meet. Again this <br /> is i ,s,ro that should be deferred until the actual sampling data has been <br /> colle�(,,d. <br /> ruercnt Work Pla„ <br /> I , yrs w! tis Lhr ,.,,nccptua) approach of the Workplan. However, meaningful <br /> cor'mcnts cannot be supplied regarding Feasibility Study, Remedial Action, or <br /> potential Rd,aedial Investigation activities. <br /> wl't=n• "s,u if. Specffie comments will be supplied <br /> sp,:clfic actions are proposed. J have supplied comments on the <br /> lnttial Enoonger,nCnt Study and Rirmadtal investigation activities presdntly <br /> pri fjo5i:d <br />