My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1988
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:14 PM
Creation date
2/22/2019 2:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1988
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX <br /> This appendix is a compilation of excerpts from the Current Work Plan <br /> (March 15, 1988) which are related to the proposed South Yard Storm Water <br /> Sampling Scope of Work. <br /> 4.3.2.1 Field Activities. (Excerpts) <br /> o Internal Quality Control. Field blanks, duplicates, and <br /> background samples will be included (when appropriate) with <br /> samples sent for laboratory analyses to monitor quality control <br /> of field sampling and laboratory analysis procedures. These QC <br /> samples are discussed in Section 3.3. <br /> Field measurements are performed onsite and do not involve <br /> samples that are collected and retained. The primary QA <br /> objective for these data is to obtain reproducible measurements <br /> to a degree of accuracy consistent with limits imposed by <br /> analytical methodologies for the intended use of the data. <br /> Quality control procedures will be limited to checking the <br /> reproducibility of measurements by taking multiple readings and <br /> by calibration of instruments (where appropriate) . <br /> A separate volume of water will be collected for the measurement <br /> of temperature, pH, and specific conductivity after samples are <br /> collected. The measurements will be taken immediately after the <br /> water is collected. <br /> The requirements listed below will be followed for field <br /> measurements: <br /> - pH. The pH will be measured with an electrometric pH probe. <br /> Each reading and the arithmetic average will be reported to <br /> one decimal place. <br /> - Temperature. Temperature will be measured with an NBS <br /> mercury thermometer and reported to the nearest 1/2 degree <br /> centigrade. <br /> - Specific Conductivity. The specific conductivity will be <br /> measured with a specific conductivity meter. Readings will <br /> be reported to the number of significant figures appropriate <br /> for the measurement. <br /> o Preventive Maintenance. Preventive maintenance of equipment is <br /> essential if project resources are to be used in a cost effective <br /> manner. Preventive maintenance will take two forms: (1) a <br /> schedule of preventive maintenance activities to minimize downtime <br /> and ensure accuracy of measurement systems and (2) availability of <br /> critical spare parts, backup systems, and equipment. <br /> A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.