My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:09 PM
Creation date
2/22/2019 2:36:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C) S E C O R <br /> Ms.Victoria McCartney <br /> September 24, 2004 <br /> Page 3 <br /> Soil Sampling and Analysis <br /> Soil samples will be collected at 5-foot intervals from ground surface to the total completion <br /> depth. Additionally, vapor headspace monitoring will be conducted on collected soil <br /> samples. Soil samples will not be submitted for chemical analysis. <br /> SCHEDULE <br /> SECOR is prepared to initiate fieldwork within 1 to 3 weeks following the approval of this <br /> Work Plan by County. Following the completion of fieldwork and receipt of laboratory data, <br /> a summary report will be prepared. The report will include boring logs, groundwater <br /> analytical data, chain-of-custody records, well construction details, a site map showing <br /> monitoring well locations, and conclusions and recommendations. <br /> If you have any questions or comments regarding the contents of this Work Plan, please <br /> contact either David Evans of SECOR at (916) 861-0400 extension 234 or Robert (Bob) <br /> Cochran of Chevron at (925) 842-9655. <br /> Sincerely, <br /> SECOR International Incorporated <br /> �5 GST.Fogs O� <br /> favid M. Evans �v�CoQ �y ins George T. Forsyth , R.G. <br /> Associate Engineer CO No.8413!1— Associate Geologist <br /> F.XP:1 <br /> DME �► „�� <br /> 9�oF CA``�4Q <br /> Enclosures: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Site Plan with Proposed CPT and Monitoring Well Location <br /> Attachment 1 Field and Laboratory Procedures <br /> cc: Robert J. Cochran, Chevron Environmental Management Company, San Ramon, <br /> California <br /> Jim Barton, Regional Water Quality Control Board, Sacramento, California <br /> (`.J. Greyhound Bus Lines, Dallas, Texas <br /> I:\Chevron\90557\REPORTS\2004\WP for Monitoring Well Installation-2004.doc SECOR International Incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.