My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:09 PM
Creation date
2/22/2019 2:36:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** ā(INACT)ā
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s Chevron Products Company ( Page 5 <br /> Chevron Service Station#9-0557, lā_ 'outh Center Street,Stockton,California November 28,2001 <br /> Revised Schedule <br /> A revised schedule for the completion of the work proposed within this addendum and the <br /> Work Plan is presented as Figure 3. As of the date of this addendum, five of the six t <br /> monitoring or extraction wells proposed in the Work Plan have been installed at the site. <br /> .Among the five wells installed is monitoring well MW-9S, which was proposed to Dot <br /> Lofstrom of SJCEHD, and approved by Ms. Lofstrom, verbally in a telephone conversation, <br /> with David Evans of SECOR on June 29, 2001. The final monitoring well proposed in the <br /> Work Plan,MW-13, will be installed once an encroachment permit with either the City of r <br /> Stockton or the California Department of Transportation can be obtained. SECOR will not , <br /> begin the OS pilot test until MW-13 is installed. The aquifer testing proposed in the Work <br /> Plan has also been completed. The schedule shown in Figure 3, which includes estimated <br /> work plan review and comment period by SJCEHD and estimated duration for permitting <br /> required with SJCEHD, outlines the estimated schedule for the remaining tasks proposed in <br /> the Work Plan and this addendum. <br /> If there are any questions regarding the contents of this revised work plan,please call us at <br /> 916.861.0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> avid M. Evans William E. Brasher, P.E. <br /> Project Scientist Project Manager <br /> Attachments: Figure 1 Site Location Map <br /> Figure 2 Site Plan with Proposed Pilot Test Facility Locations <br /> Figure 3 Revised Schedule <br /> Attachment A Field and Laboratory Procedures <br /> Attachment B Ozone Sparging Equipment Details <br /> cc: Bob Cochran, Chevron Products Company, San Ramon <br /> Marty Hartzell, Regional Water Quality Control Board, Sacramento <br /> I:\Chevron\90557\REPORTS\Feasibility Study\03_Addendum.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.