My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
WORK PLANS FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:26:09 PM
Creation date
2/22/2019 2:36:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
FileName_PostFix
FILE 2
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Products Company 4 <br /> Chevron Service Station#9-0557,139 South Center Street,Stockton,California 6/01/01 <br /> treatment works. The aquifer test well be conducted over an approximate 4-day <br /> period. A more detailed description of Aquifer Test procedures is presented as <br /> Attachment E. <br /> Schedule <br /> A schedule for the completion of the work proposed within this work plan is presented <br /> as Figure 3. This schedule includes estimated work plan review and comment period by <br /> SJCEHD and estimated duration for permitting required with SJCEHD and San Joaquin <br /> Valley Unified Air Quality Control District (SJVUAPCD). <br /> If there are any questions regarding the contents of this revised work plan, please call us <br /> at 916.861.0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> id M. Evans <br /> Staff Scientist <br /> William E. Brasher, P.E. <br /> Senior Engineer <br /> Attachments: <br /> Figure 1 —Site Location Map <br /> Figure 2—Site Plan with Proposed Well Locations <br /> Figure 3 —Proposed Schedule <br /> Attachment A—April 9, 2001 SJCEHD Letter <br /> Attachment B —Summary of Previous Investigations <br /> Attachment C—Field and Laboratory Procedures <br /> Attachment D—Overview of DPE Treatment <br /> Attachment E—Overview of Aquifer Test Procedures <br /> cc: Bob Cochran, Chevron Products Company, San Ramon <br /> Marty Hartzell, Regional Water Quality Control Board, Sacramento <br /> Sheldon Nelson, Chevron Research and Technology Company, San Ramon <br /> Mark Trewartha, SECOR, Portland <br /> 1:\Chevron\90557\REPORTS\Feasibility Study\workplan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.