My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 6:00:31 PM
Creation date
2/22/2019 2:39:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1990
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid document has been sent to approved con- <br /> tractors and to the Department of Health <br /> Services . Bids are due October 10, 1990. <br /> 2. Subsurface Soils . <br /> The design of the flushing system has been <br /> started and is expected to be completed by <br /> the December 1st , 1990 submitted date . <br /> 3. Groundwater . <br /> Equipment for the additional 150 gpm treating <br /> unit is to be shipped by October 12, 1990. <br /> Construction documents have been given to <br /> the contractor and site work could begin as <br /> soon as permits are obtained . <br /> The design of the extraction well field and <br /> force main to the treatment plant have been <br /> started . <br /> The application to revise the NPDES permit to <br /> increase the flow rate has been filed . <br /> D. StormWater Run-:Off . <br /> The Stormwater Report was completed and sent to <br /> the agencies on September 13, 1990. <br /> Please advise if you have any questions . <br /> Sincerely , <br /> HE MARLEY COOLING TOWER CO. <br /> David W. Bates <br /> DWB/jel hief Production Engineer <br /> Attachment <br /> cc' s : William Ryan-DHS al Siebal -DHS <br /> Ronald Valinoti-SJEH Antonia Vorster-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Hal Daley-Stockton Tom Hickey-Black & Veatch <br /> Karl Lytz- File <br /> Latham & Watkins <br />
The URL can be used to link to this page
Your browser does not support the video tag.