Laserfiche WebLink
0 <br /> 2 . Subsurface Soils . <br /> Design of the flushing system has been sent <br /> to the agencies for review. <br /> 3. Groundwater . <br /> The installation of the Andco Water Treating <br /> System is nearing completion with a tentative <br /> start—up date of December 17. 1990. <br /> The report of the extraction well field design <br /> is due December 17 . 1990. <br /> The construction documents for the groundwater <br /> collection system have been sent to the <br /> agencies and the contractor for review. <br /> The draft of the NPDES Permit modification <br /> has been released by the California Water <br /> Quality Control Board . Comments have been re— <br /> quested by December 21 with the January 30. <br /> 1991 meeting of the Regional Board scheduled <br /> to consider these modifications . <br /> C. Water Supply — 4400 Main . <br /> The two (2) residences using the domestic well <br /> at 4400 Main Street were connected to the public <br /> water supply as of October 30, 1990. <br /> Please advise if you have any questions . <br /> Sincerely . <br /> THE MARLEY COOLING TOWER CO. <br /> David W. Bates <br /> Chief Production Engineer <br /> DB/;lel <br /> Attachment <br /> cc' s : William Ryan—DHSSiebal —DHS <br /> Ronald Valinoti—SJEHD Camilla Williams—CRWQCB <br /> Jeff Zelikson—USEPA Tim Verhagen—TMC <br /> Hal Daley—Stockton Tom Hickey—Black & Veatch <br /> Karl Lytz— File <br /> Latham & Watkins <br />