Laserfiche WebLink
B LACK & VEATC H <br /> ENGINEERS-ARCHITECTS qy TEL. (9131 339-2000 <br /> r � wo, 1500 MEADOW LAKE PARKWAY <br /> ` MAILING ADDRESS P.O.BOX NO.8405 <br /> APR 2 1991 KANSAS CITY,MISSOURI 64114 <br /> ENVpERM1T SERV CESONMENTAL LTH <br /> Marley Cooling Tower Company B&V Project 11654.652 <br /> Stockton, California Facility B&V File CA <br /> Contract No. 13 April 1 , 1991 <br /> Public Health Services <br /> San Joaquin County <br /> 445 N. San Joaquin Street <br /> Stockton, California 95202 <br /> Subject: Drilling Permit Application <br /> Phase I Construction <br /> Subsurface Soil Flushing System <br /> Attention: Ms. Laurie Cotulla <br /> Dear Ms. Cotulla: <br /> Reference is made to our telephone conversation of March 26, 1991 in <br /> regards to obtaining the appropriate drilling permit required to begin <br /> Phase I construction of the subsurface soil flushing system at the <br /> Marley Cooling Tower Company's (MCTC) Stockton, California facility. <br /> As you requested, enclosed you will find the following items: <br /> • March 13, 1991 DHS letter to MCTC acknowledging that the DHS <br /> is satisfied with review comment resolution for this project. <br /> Supplemental health and safety information was submitted to <br /> DHS on March 20, 1991. DHS is the designated lead agency and <br /> I recommend that you call Mr. Jim Austreng at (913) 855-7857 <br /> if you have any questions related to their review of the <br /> construction documents for this project. <br /> • Operating Description and Sampling and Monitoring Plan <br /> document for the subsurface soil flushing system. Please <br /> reference Sections 1.2 and 1.3 of the document for a general <br /> description of the flushing system and the related sampling <br /> and monitoring activities. <br /> • Construction drawings G-1 through G-5. Drawings G-1 and G-3 <br /> illustrate a plan view and section views of the monitoring <br /> tubes and injection wells to be installed during Phase I <br /> construction. <br />