My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA PETE WILSON Governor <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD— <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD, SUITE A =, U <br /> SACRAMENTO, CA 95827-3098 <br /> PHONE: (916) 361-5600 <br /> FAX: (916) 361-5686 <br /> 31 January 1991 <br /> IlkF <br /> Mr. David Bates F02�Fi9 <br /> Marley Cooling Tower Company <br /> 5800 Foxridge Drive ,r <br /> Mission, Kansas 66201 `sFpG�y`pCj <br /> REVIEW OF THE SUBSURFACE SOIL FLUSHING SYSTEM AND THE GROUND WATER COLLECTION <br /> SYSTEM DESIGN DOCUMENTS, MARLEY COOLING TOWER COMPANY, SAN JOAQUIN COUNTY <br /> We have reviewed the design documents for the Subsurface Soil Flushing System and <br /> the Ground Water Extraction System submitted on 3 December 1990 by Black and <br /> Veatch. It appears that much consideration has been given in preparation of this <br /> treatment system for the cleanup of the unsaturated zone at the site. However, <br /> We have two major technical concerns which should be evaluated and the applicable <br /> designs reconsidered prior to the commencement of construction on 1 March 1991, <br /> as scheduled in the Remedial Action Plan. Our concerns involve the soil sample <br /> analyses and the depth of length of screen intervals in the monitoring tubes and <br /> wells. Enclosed is a memorandum which discusses these concerns. <br /> The design documents stated that a high strength treatment system will be <br /> constructed in Phase III of the Subsurface Soil Treatment System. Because this <br /> system will be installed prior to the five year renewal of the National Pollutant <br /> Discharge Elimination System (NPDES) permit, we require that a Report of Waste <br /> Discharge for this system be submitted four months prior to the renewal of the <br /> NPDES permit. <br /> If you have any questions, please call me at (916)361-5670. <br /> CAMILLA WILLIAMS <br /> Engineering Geologist <br /> CKW:cw <br /> Enclosure <br /> cc: Mr. Jim Austreng, Department of Health Services, Region 1 , Sacramento, <br /> Ron Valenoti , San Joaquin County Public Health Services, Stockton <br /> Mr. Tom Hickey, Black and Veatch, Kansas City, Missouri <br /> Mr. Peter Quinlan, Hargis and Associates, La Jolla <br />
The URL can be used to link to this page
Your browser does not support the video tag.