My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATING DESCRIPTION AND SAMPLING AND MONITORING PLAN <br /> SUBSURFACE SOIL FLUSHING SYSTEM <br /> MARLEY COOLING TOWER COMPANY <br /> TABLE OF CONTENTS <br /> SECTION TITLE PAGE <br /> 1.0 INTRODUCTION 1-1 <br /> 1.1 SITE LOCATION, DESCRIPTION, AND HISTORY 1-1 <br /> 1.2 DESCRIPTION OF SUBSURFACE SOIL FLUSHING SYSTEM 1-2 <br /> 1 .3 SCOPE OF SAMPLING AND MONITORING ACTIVITIES 1-3 <br /> 2.0 OPERATING DESCRIPTION 2-1 <br /> 2.1 CONSTRUCTION OF SUBSURFACE SOIL FLUSHING SYSTEM 2-1 <br /> 2.1.1 Construction of Pilot Flushing System 2-1 <br /> 2.1.2 Construction of Full-Scale Flushing System 2-2 <br /> 2.2 OPERATION OF SUBSURFACE SOIL FLUSHING SYSTEM 2-3 <br /> 2.2.1 Pilot Flushing System Operation 2-3 <br /> 2.2.2 Full-Scale Flushing System Operation 2-4 <br /> 3.0 SAMPLING AND MONITORING PLAN 3-1 <br /> 3.1 OBJECTIVES OF SAMPLING AND MONITORING ACTIVITIES 3-1 <br /> 3.1.1 Phase I Objectives 3-1 <br /> 3. 1.2 Phase II Objectives 3-1 <br /> 3.1.3 Phase III Objectives 3-2 <br /> 3.1.4 Phase IV Objectives 3-2 <br /> 3.2 SAMPLING PROCEDURES AND ANALYTICAL METHODS 3-2 <br /> 3.2.1 Subsurface Soil Sampling 3-2 <br /> 3.2.1.1 Chemical Samples 3-3 <br /> 3.2.1.2 Physical Samples 3-3 <br /> 3.2.1.3 Lithologic Samples 3-3 <br /> 3.2.2 Ground Water Sampling 3-3 <br /> 3.2.3 Lysimeter Sampling 3-4 <br /> 3.3 SAMPLE MANAGEMENT 3-4 <br /> 3.3.1 Sample Packaging and Shipment 3-4 <br /> 3.3.2 Sample Documentation 3-5 <br /> 3.3.3 Decontamination and Disposal 3-6 <br /> 3.3.3.1 Decontamination 3-6 <br /> 3.3.3.2 Disposal 3-6 <br /> 3.4 MONITORING ACTIVITIES 3-6 <br /> 3.4.1 Water Level Measurements 3-6 <br /> 3.4.2 Neutron Probe Measurements 3-7 <br /> 3.4.3 Injection System Monitoring 3-8 <br /> 11654.652 TOC-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.