Laserfiche WebLink
OPERATING DESCRIPTION AND SAMPLING AND MONITORING PLAN <br /> SUBSURFACE SOIL FLUSHING SYSTEM <br /> MARLEY COOLING TOWER COMPANY <br /> TABLE OF CONTENTS <br /> SECTION TITLE PAGE <br /> 1.0 INTRODUCTION 1-1 <br /> 1.1 SITE LOCATION, DESCRIPTION, AND HISTORY 1-1 <br /> 1.2 DESCRIPTION OF SUBSURFACE SOIL FLUSHING SYSTEM 1-2 <br /> 1 .3 SCOPE OF SAMPLING AND MONITORING ACTIVITIES 1-3 <br /> 2.0 OPERATING DESCRIPTION 2-1 <br /> 2.1 CONSTRUCTION OF SUBSURFACE SOIL FLUSHING SYSTEM 2-1 <br /> 2.1.1 Construction of Pilot Flushing System 2-1 <br /> 2.1.2 Construction of Full-Scale Flushing System 2-2 <br /> 2.2 OPERATION OF SUBSURFACE SOIL FLUSHING SYSTEM 2-3 <br /> 2.2.1 Pilot Flushing System Operation 2-3 <br /> 2.2.2 Full-Scale Flushing System Operation 2-4 <br /> 3.0 SAMPLING AND MONITORING PLAN 3-1 <br /> 3.1 OBJECTIVES OF SAMPLING AND MONITORING ACTIVITIES 3-1 <br /> 3.1.1 Phase I Objectives 3-1 <br /> 3. 1.2 Phase II Objectives 3-1 <br /> 3.1.3 Phase III Objectives 3-2 <br /> 3.1.4 Phase IV Objectives 3-2 <br /> 3.2 SAMPLING PROCEDURES AND ANALYTICAL METHODS 3-2 <br /> 3.2.1 Subsurface Soil Sampling 3-2 <br /> 3.2.1.1 Chemical Samples 3-3 <br /> 3.2.1.2 Physical Samples 3-3 <br /> 3.2.1.3 Lithologic Samples 3-3 <br /> 3.2.2 Ground Water Sampling 3-3 <br /> 3.2.3 Lysimeter Sampling 3-4 <br /> 3.3 SAMPLE MANAGEMENT 3-4 <br /> 3.3.1 Sample Packaging and Shipment 3-4 <br /> 3.3.2 Sample Documentation 3-5 <br /> 3.3.3 Decontamination and Disposal 3-6 <br /> 3.3.3.1 Decontamination 3-6 <br /> 3.3.3.2 Disposal 3-6 <br /> 3.4 MONITORING ACTIVITIES 3-6 <br /> 3.4.1 Water Level Measurements 3-6 <br /> 3.4.2 Neutron Probe Measurements 3-7 <br /> 3.4.3 Injection System Monitoring 3-8 <br /> 11654.652 TOC-1 <br />