Laserfiche WebLink
TABLE 2A-2 <br /> Estimated Quantities <br /> Phase III <br /> Field Work Quantity <br /> Dual-Wall Reverse Circulation Borings 13 (max) <br /> Hollow-Stem Auger Borings 5 (min) <br /> Injection Wells 9 <br /> Extraction Well 1 <br /> Monitoring Tubes 6 <br /> Lysimeter Clusters 2 <br /> 12 inch Dual-Wall Reverse Circulation Boring, Feet 125 <br /> 9 inch Dual-Wall Reverse Circulation Boring, Feet 350 <br /> 9-5/8 inch (O.D. ) Hollow-Stem Auger Boring (Vertical ) Feet 140 <br /> 5-1/2 inch Dual-Wall Reverse Circulation Boring, Feet 450 <br /> 6-5/8 inch Dual-Wall Reverse Circulation Boring, Feet 100 <br /> 7-5/8 inch (O.D. ) Hollow-Stem Auger Borings (450 Angle) , Feet 210 <br /> Split Barrel Samples 246 <br /> Thin-walled Tube Samples and/or Brass Ring Samples 25 <br /> 6 inch PVC Screen, Schedule 80, with <br /> 0.03-inch slot, Feet 50 <br /> 6 inch PVC Riser, Schedule 80, Feet 75 <br /> 4 inch PVC wire wrap Screen with <br /> 0.125-inch continuous slots, Feet 300 <br /> 4 inch PUC Riser, Schedule 80, Feet 120 <br /> 2-1/2 inch Aluminum Riser Pipe, Schedule 80, Feet 425 <br /> 2-1/2 inch PVC Screen, Schedule 80, with 0.01-inch slots, Feet 75 <br /> (MARLEY SSFS <br /> 2A-15 <br /> (CONTRACT NO. 13 ) <br /> (11654.652 <br /> (11654.652 ) <br />