Laserfiche WebLink
2. Subsurface Soils . <br /> Comments from Department of Health Services and <br /> California Regional Water Quality Control Board <br /> were received and the plan has been modified to <br /> include these comments . The design of the <br /> Pilot test is nearing completion with con— <br /> struction for the pilot test scheduled to start <br /> in March . <br /> 3. Groundwater . <br /> The start—up of the Andco unit was delayed <br /> until week of January 14th because of the <br /> freeze in the Stockton area in late December . <br /> There were a significant number of broken <br /> Pipes . fittings and valves that delayed start— <br /> up . In addition the Pipe line from EW-1 was <br /> frozen solid . <br /> The NPDES Permit was approved by the Board <br /> at the January meeting . <br /> Please advise if you have any questions . <br /> Sincerely , <br /> THE MARLEY COOLING TOWER CO. <br /> David W. Bates <br /> Chief Production Engineer <br /> DB/jel <br /> Attachment <br /> cc' s : William Ryan—DHSSiebal —DHS <br /> Ronald Valinoti—SJEHU&o amilla Williams—CRWQCB <br /> Jeff Zelikson—USEPA Tim Verhagen—TMC <br /> Howard Rinne—Stockton Tom Hickey—Black & Veatch <br /> Karl Lytz— File <br /> Latham & Watkins <br />