Laserfiche WebLink
Mr. Thomas Kroehle <br /> Page 2 <br /> November 20, 1991 <br /> modifications and proposed amendment language. For the purposes <br /> of the SA, the Department will consult with the Board and make a <br /> determination of the merits of the proposed change. For purposes <br /> of the 1988 RAO, the Department will make a determination of the <br /> merits of the proposed change. If rejected by the Department <br /> (and the Board for purposes of the 1984 SA) , a Notice of Final <br /> Determination of Non-Compliance will be issued. <br /> If the modifications are accepted by the Department and <br /> Board, the SA and RAO will be amended. If approved only by the <br /> Department, the modifications will be limited to the RAO. <br /> If MCTC fails to comply with the revised SA and RAO <br /> construction schedule, the Department, upon consultation with and <br /> concurrence from the Board, will issue a Final Notice of Non- <br /> Compliance. If the Department issues a Final Determination of <br /> Non-Compliance, the Department will take further action, which <br /> may include enforcement action and/or performance of the work <br /> stipulated in the RAO and SA. Any additional costs incurred by <br /> the Department as a result of performing the work stipulated in <br /> the RAO and SA will be added to all other costs incurred, <br /> including administrative costs, which the Department will seek to <br /> recover from you in this matter. <br /> If you have any questions on this notice, please contact me, <br /> Donn Diebert, P.E. , or Jim Austreng of my staff at (916) <br /> 855-7857 . <br /> Sincerely, <br /> 9 <br /> Anthony J. Landis, P.E. <br /> Chief, Site Mitigation Branch <br /> cc: Senator Patrick Johnston <br /> 31 E. Channel, Room 440 <br /> Stockton, CA 95202 <br /> Ms. Camillia Williams <br /> Central Valley Regional Water Quality <br /> 3443 Routier Road <br /> Sacramento, CA 95827-3098 <br />