My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> Fiph �� V 0- <br /> BLACK & VEATCH SEP 12 1991 <br /> -,.• "'- f , 1 T <br /> 8400 Ward Parkway,P.O.Box No.8405,Kansas City,Missouri 64114,(913)339-2pVrS j vi 1 1 %:•C 11'I i C L CS <br /> Transmitted via Telephone Facsimile <br /> Marley Cooling Tower Company B&V Project 11654.682 <br /> Stockton, California Facility B&V File C.4 <br /> Contract No. 13 September 6, 1991 <br /> Public Health Services <br /> San Joaquin County <br /> 445 N. San Joaquin Street <br /> Stockton, California 95202 <br /> Subject: Drilling Permit Application <br /> Phase II Confirmation Drilling <br /> Subsurface Soil Flushing System <br /> Attention: Ms. Eleanor Ratliff <br /> Dear Ms. Ratliff: <br /> Reference is made to our recent telephone conversations in regards to <br /> obtaining the appropriate drilling permit required for confirmation <br /> drilling to be conducted at Marley Cooling Tower Company's Stockton, <br /> California facility. The confirmation drilling will be performed by <br /> Layne Environmental Services (Layne) personnel as part of the Phase II <br /> monitoring of the pilot subsurface soil flushing system at MCTC's <br /> facility. <br /> I have asked Layne Environmental Services, Inc. (Layne) to submit the <br /> signed permit application materials to your attention by September 12, <br /> 1991. As we discussed, please process the permit application as soon as <br /> possible. The confirmation drilling activities at the site are <br /> scheduled to begin September 16, 1991. <br /> Layne' s permit application submittal will include the following items: <br /> • "APPLICATION FOR PERMIT SAN JOAQUIN COUNTY PUBLIC HEALTH <br /> SERVICES, ENVIRONMENTAL HEALTH DIVISION" triplicate form <br /> signed by the licensed contractor and the required $89.00 <br /> permit fee. <br /> • Figure 1 plan view of the borings to be completed during the <br /> confirmation drilling activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.