My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:06:16 PM
Creation date
2/22/2019 2:41:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1991
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MARLEY COOLING TOWER COMPANY <br /> (:N:A:RLEY' 8 <br /> ENVIRONMENTAL PROJECT <br /> ' SUMMER 1991 CONSTRUCTION FACT SHEET <br /> The Marley Cooling Tower Company is providing you with this fact sheet to make you aware of construction activities that will occur in <br /> your neighborhood this summer. <br /> Several years ago, Marley discovered that the wood treating operations conducted at its 150 N. Sinclair plant in East Stockton had caused <br /> an environmental problem. The operating procedures of the wood treating facility resulted in releases, that over the years contaminated <br /> the ground water. Initially, these procedures were changed to eliminate the releases and in January of 1991 all wood treating at the facility <br /> was stopped. <br /> Since the discovery of the problem, Marley has been working <br /> closely with the California Department of Health Services, San O <br /> Joaquin County Department of Health and California Regional <br /> Water Quality Control Board tr rlean up the affectsd cc!!s and 06 <br /> water as expeditiously as possible. 0F`P <br /> ufd <br /> Part of the clean up process will involve the collection of ground ,�a <br /> water from several points south of the Sinclair facility,transport <br /> of the water through a pipeline back to the plant,and treatment <br /> of the water by a water treatment facility located at the plant. t <br /> Construction of the treatment plant on the Sinclair property is <br /> rte°ss xrxn«nw �v1x rxo\ <br /> almost complete. Crutchfield Construction will construct the m„a <br /> pipeline this summer. J� <br /> e.'l ..,wow <br /> The areas most affected by the pipeline installation activities will \ <br /> be East Main Street from Dawes Avenue to Sinclair Avenue, STOC <br /> KTON a <br /> Sinclair Avenue from East Main Street to the plant, and Carroll ; 9 <br /> Avenue from Washington Street to the plant. All trenching and <br /> pipe installation will be in public right-of-way, along these - I i # <br /> streets. <br /> i <br /> Crutchfield Construction will notify property owners in advance ---all„1 <br /> of any work that might temporarily restrict the use of their --- AREA To BE <br /> property. Measures to control dust, noise and traffic will be O coNSTRuc°TION <br /> employed. All driveways and sidewalks affected by the ACTIVITIES <br /> construction will be restored to their original condition. At least <br /> one lane of traffic will be kept open at all times. Your safety and <br /> convenience will be given high priority during the progress of <br /> this project. SITE LOCATION <br /> FOR MORE INFORMATION <br /> If you would like more information or have questions,please call An information repository containing more information about the <br /> or write: site has been established in Stockton. You are welcome to read <br /> Tony Calestini, Plant Engineer the information and provide us with comments or questions. The <br /> Marley Cooling Tower Company information repository is located at: <br /> 150 N. Sinclair Avenue <br /> Stockton, CA 95205 Stockton Public Library <br /> 209/4653451 605 N. EI Dorado Street <br /> David Bates Stockton, CA 95203 <br /> Marley Cooling Tower Company 209/944-8221 <br /> 5800 Foxridge Drive <br /> Mission, KS 66202 <br /> 913/362-1818 <br /> Or, if you would like to talk to the Department of Health Services Contact: Information Desk <br /> about the Marley project, the project supervisor is: Hours: Monday 10 a.m. -9 p.m. <br /> Tuesday 10 a.m. -6 P.M. <br /> Jim Austreng Wednesday 10 a.m. - 9 p.m. <br /> Thursday 10 a.m. - 9 p.m. <br /> California Department of Health Services Friday 10 a.m. - 5 p.m. <br /> Toxic Substances Control Program Saturday 10 a.m. -5 p.m. <br /> 10151 Croydon Way Sunday Closed <br /> Sacramento, CA 95827-2106 <br /> 916/855-7857 <br />
The URL can be used to link to this page
Your browser does not support the video tag.