Laserfiche WebLink
IVO.604 P 3 <br /> e w . <br /> rt <br /> i,M1n <br /> middle of the floor and the large "Square D" NCC <br /> along the wall, both in the northwest portion of the rF } <br /> building, The small electrical panel along the insEiia '`-`' '.' "�Y� <br /> of the west wall is to remain. +fit <br /> Under sub-item 4, miscellaneous metal, add in the <br /> transport and disposal of electrical wiring, COAduitt "i; <br /> and equipment demolished under Bid item NO. 5.: . <br /> • Bid Stem No. 6 - well logs for the three monitoring wwlYs <br /> are not immediately available. However, from reporting `xt ` <br /> the three 4-inch PVC wells are at depths of 32.5 ft, 20 5y. <br /> ft, and 10.5 ft. This is the assumption that should be mf <br /> for preparing your bid. Well closure according to Ban <br /> Joaquin County Standards is the requirement being <br /> referenced. <br /> • Bid Item No. 7 - The bid item is modified to include the,. <br /> following: <br /> - For sub-item 6, the text is revised to say ^10 inches''' <br /> of backfill is required rather than "12 inches.° <br /> . <br /> - For sub-item 11, wiring work associated with reiocatitn . <br /> Of the power poles is part of this 1si <br /> sum bid <br /> and is not to be covered on a T&M basis under BiddItntt' <br /> No.S. <br /> • Bid Item No. B - The bid item is modified to include the <br /> following: t <br /> - Text is revised to reflect a 4-inch asphalt thickness <br /> as part Of the cap over the retort pit, and a 2-inch Y, 'r <br /> asphalt thickness everywhere else on the site. <br /> - This bid item may be removed from the project by the <br /> Contractor to be completed as part of the overall <br /> Marley asphalt maintenance program this fall. Jt <br /> Item 5 at the to of "f <br /> p page SF-6 was not discussed at the pre-bid <br /> meeting, however, one additional comment is made here. The datooY',}.¢ <br /> filled in by the contractor are only for use in evaluating.b�ds ' f <br /> Black & Veatch will establish the actual notice to proceed a9 a <br /> Part of the contract. C{ " <br /> Reference was made to Attachment B to the subcontract Agr6Nt, . + <br /> Page B-1 . Bradford stated that the lump sum number referenceel' <br /> will be based on prices submitted on the Bid Form. <br /> These notes and changes to the Bid Items become part of the bid <br /> package As Amendment No. 1 . A signed and dated copy must be wyr <br /> Submitted along with the other mandatory bid sheets. <br /> ACKNOWLEDGEMENT OF RECEIPT OF AMENDMENT NO. xt % <br /> THE BID SUBMITTED. 1 AND INCLUSION IN H ;Z <br /> By: <br /> (Name) (Date) <br /> t <br /> Title: t o, <br /> y <br /> • Company: <br /> rd%ns f <br /> 200 G68'ON ££b£89b602T J09aHN L£:ST L.6/9T/OT <br />