My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY � i <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 g3 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> February 4 , 1993 <br /> Mr .� Dumpan A4!3tin i <br /> Dep rtJ nt of oxic u s a eA Control <br /> Ac cut}t t g /Uni ` \ <br /> P. Ol/ Bo 06 �����JJJJJJ <br /> Sacramento , California 95812-0806 <br /> RE: Progress Report For December , 1992 and January , 1993 <br /> Dear Mr . Austin: <br /> The following is a report for the activities related to the <br /> Stockton site for December , 1992 and January , 1993 . <br /> A_ Groundwater Monitoring And Treatment <br /> The fourth quarter and performance monitoring was <br /> done the week of November 9 , 1992 . The report with <br /> updated modeling and recommended changes is due mid- <br /> February in advance of the meeting scheduled for <br /> February 23 , 1993 , <br /> The January sampling was done the weeks of January <br /> 25th and February 1 , 1993 . <br /> The Treating Plant output continues to improve <br /> ( 15 . 1 mif . gals . in November and 14 . 2 mil . gals in <br /> December ) The .January output was 16 . 7 mi (/gallons . <br /> Several different problems causing the trivalent <br /> chrome excursions have been isolated and corrected . <br /> The water quality in the last half of January <br /> improved dramatically and should continue much <br /> improved. <br /> MARLEY <br /> = <br />
The URL can be used to link to this page
Your browser does not support the video tag.