Laserfiche WebLink
a <br /> B. Remedial Activities <br /> 1 . Subsurface Soils. <br /> All wells and lysimeter boring are com- <br /> plete . The contract for the piping and <br /> electrical connection has been bid and <br /> start-up is estimated to be week of June <br /> 12th. <br /> 2. GroundWater_ <br /> The first phase of the Performance Moni- <br /> toring Plan (PMP) was done the week of <br /> March 9th. The results of this should be <br /> available with the Quarterly Report on <br /> April 16, 1992. <br /> The next phase will be done in con- <br /> junction with the quarterly monitoring <br /> the week of April 20, 1992. <br /> C. NPDES Permit. <br /> Board is still reviewing the permit application. <br /> Please advise if you have any questions. <br /> Sincerely, <br /> THE MARLEY� C^OOLING TOWER CO. <br /> David W. Bates <br /> Chief Production Engineer <br /> DWli/j e l <br /> Attachment <br /> cc's: William Ryan-DHS Val Siebal-DHS <br /> Ronald Valinoti-SJEHD Cori Condon-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Howard Rinne-Stockton Tom Hickey-Black & Veatch <br /> File <br />