My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362.1818 <br /> F E 8 18 1992 <br /> ENVIRONIME(VTAL HE/.,?_'i i <br /> PERMIT/SERVICE <br /> ruary 3, 1992 <br /> Mr. Jim Austreng <br /> Depa tment f xic Substances Control <br /> P. 0. 0 806 <br /> Sacramento, California 95812-0806 <br /> RE: Progress Report for December, 1991 and January, 1992 <br /> Dear Mr. Austreng: <br /> The following is a report of the activities at the <br /> Stockton site for December, 1991 and January, 1992- <br /> A. GroundWater Monitoring. <br /> Samples for the first quarter.o£ 1992 were taken <br /> the week of January 27th and February 3, 1992. <br /> B. Remedial Activities. <br /> 1. Subsurface Soils. <br /> Bid documents for installation of the Flushing <br /> System are being reviewed by the contractors. <br /> Comments have been received from the Agencies <br /> and the bid documents have been revised to <br /> reflect these comments. <br /> 2. Groundwater_ <br /> The upgrade of the Andco System is essentially <br /> complete_ All stormwater has been removed from <br /> the North Yard with treatment through the Andco <br /> System. In addition, some ground water has <br /> been treated. This water was extracted and <br /> MARLEY <br /> the <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.