My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_BLACK & VEATCH <br /> 8400 Word Parkway,P.O.Box No.8405,Kansas City,Missouri 64114,;9131339-2000 <br /> � qW ` <br /> Marley Cooling Tower Company *V Prgjects 11654.812 <br /> Stockton, California Facility B&V File C.4 <br /> Soil Flushing Project JAN 2 1 1992 January 17 , 1992 <br /> ENVIRONMENTAL <br /> pERMIT/SERV CE STH <br /> State of California <br /> Department of Toxic Substances Control , Region 1 <br /> 10151 Croydon Way, Suite 3 <br /> Sacramento, CA 95827-2106 <br /> Subject: Transmittal of Documents <br /> Attention: Mr. Jim Austreng <br /> Gentlemen: <br /> On behalf of the Marley Cooling Tower Company, I have enclosed 2 copies <br /> of the following documents pertaining to the soil flushing project at <br /> MCTC' s Stockton, California facility: <br /> MCTC Contract No. 13 (Revised) Addendum No. 1 , <br /> dated January 17, 1992. <br /> Health and Safety Plan (Kleinfelder, Inc. ) , <br /> dated January 10, 1992. <br /> The addendum revises and supplements the November 25, 1991 , construction <br /> specifications and documents previously provided. As discussed with <br /> you and Ms. Cori Condon, Addendum No. 1 includes the addition of a <br /> monitoring tube (MT-9) and a lysimeter cluster (L-309, 310) directly <br /> east of the retort pit area. Additional general construction details <br /> and information are also provided within the addendum. <br /> The project specific health and safety plan has been revised based on <br /> the analytical results of soil , groundwater, and air sampling conducted <br /> during pilot and confirmation drilling activities at the site. <br /> Contractors will submit construction bids for the project by January 31 , <br /> 1992. Bid evaluation and award of the contract should be completed by <br /> February 7, 1992. Construction of the full-scale soil flushing system <br /> is currently scheduled to begin on February 17 , 1992. <br />
The URL can be used to link to this page
Your browser does not support the video tag.