Laserfiche WebLink
TABLE 2A-1 (continued) <br /> Estimated Quantities <br /> Field Work Quantity <br /> Lysimeters and equipment 10 <br /> 1-1/2 inch PVC, Schedule 40, Feet 420 <br /> Heavy-Duty Watertight Cast Iron Manholes 13 <br /> 55-Gallon Drums Provided by Contractor 75+ <br /> 55-Gallon Drums Filled and Staged by Contractor 50+ <br /> Decontamination, Hours 25+ <br /> Protective Guard Posts 12 <br /> Moisture Content Tests 60 <br /> Centralizers 9 <br /> End Caps, 2-1/2 inch PVC Slip Caps 3 <br /> Top Caps, 2-1/2 inch Aluminum Cap with similarly keyed locks 3 <br /> End Caps, 4 inch PVC Slip Caps 2 <br /> (MARLEY FSSF <br /> 2A-13 <br /> (CONTRACT NO. 13 ) <br /> (11654.812 ) <br />