My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 2004-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 7:04:53 PM
Creation date
2/22/2019 3:01:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 2004-2014
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> Central Valley Region <br /> RoberfSchneider Chaig-n-) <br /> Terry Tamminen -- "t <br /> Secretary for Sacramento Main Office - I A Arnold Schwarzenegger <br /> Environmental Internet Address: http://w .swrcb.ca.gov/mql-4 lti,� 2, y 2904 Governor <br /> Protection 11020 Sun Center Drive#200 Rancho Cordova,CA 95E6114 <br /> Phone(916)464-3291 ENVIRONMENT HEALTH <br /> 17 June 2004 pERMITISERVICES <br /> Mr. David Lieb <br /> Environmental Manager <br /> Marley Cooling Technologies <br /> 200 N. Wagner Avenue <br /> Stockton, California 95215 <br /> WORKPLAN FOR INSTALLATION OF GROUNDWATER EXTRACTION WELL S-9, MARLEY <br /> COOLING TECHNOLOGIES FACILITY, STOCKTON, CALIFORNIA <br /> The Regional Water Quality Control Board (Regional Board) staff have reviewed the Workplan for <br /> Installation of Groundwater Extraction Well S-9 received on 4 June 2004 prepared by Dudek & <br /> Associates on behalf of SPX Corporation and Marley Cooling Technologies. In order to increase <br /> hydraulic capture of the chromium plume, the Workplan proposes installation of one shallow zone <br /> groundwater extraction well (S-9) and associated pump, controls, and piping to the existing remedial <br /> well field. The proposed well is designed to pump 5 to 10 gallons per minute of water from the shallow <br /> water-bearing zone. <br /> Our comments on the Workplan are provided below: <br /> 1. You may proceed with installation of the extraction well and associated work provided that the <br /> installation is conducted in accordance with the San Joaquin County requirements and an <br /> appropriate permit is obtained from the County. <br /> 2. We understand that the work is anticipated to start in mid-to-late June 2004. Please provide <br /> documentation to our office upon completion of the work. <br /> If you have any questions or concerns, please contact me at (916)464-4678 or e-mail at <br /> Tal�anksQ,rb5s.swrcb.ca gov. <br /> Sudhakar Talanki, P.E. <br /> Water Resources Control Engineer <br /> cc: Mr. Peter Quinlin, Dudek &Associates, Encinitas <br /> Mr. Dan McGrade, SPX Corporation, Charlotte,North Carolina <br /> Mr. Steven Ross, DTSC, Sacramento <br /> Mr. Harlin Knoll, San Joaquin County Health Division, Stockton <br /> California Environmental Protection Agency <br /> p�a Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.