Laserfiche WebLink
a a? <br /> r <br /> GROUNDWATER TECHNOLOGY <br /> STANDARD OPERATING PROCEDURE <br /> CONCERNING XONITORING +TELT, INSTALL;LTION <br /> SOP 13 <br /> The boreholes for the monitoring wells shall be drilled <br /> using a truck nountRd hollow stem auger drill rig. The <br /> outside diameter (o-D-) of the auger should ba a minimum <br /> Of eight Inches when installing 4-inch well screen. The <br /> hollow stem auger provides minimal interuptionof drill- <br /> �, Ing while permitting soil sampling at specific intervals. <br /> Soil samples can be taken at desired depths by hammering <br /> a conventional split barrel sampler containingprecleaned <br /> - 2 inch brass sample tubes. <br /> The construction details of the monitoring wells to be <br /> drilled at the site are graphically depicted in the <br /> attached figure titled "Typical Detail of Monitoring Well <br /> Construction (See Figure i) - ;he wells should be cons- <br /> tructed of 4 inch PVC, .020 inch machine clotted screen <br /> and blank casing. The screened portion of the well will <br /> extend 5 feet above and 10 feet below the present water <br /> table. An appropriate sand pack as determined by grain <br /> size analysis shall be placed in the annular space between <br /> the casing and drilled :vole to inhibit silt buildup around <br /> the well. An annular seal installed above the sand pack <br /> should consist of bentonite pellets overlain by neat <br /> cement or cement grout to the surface. The wellhead shall <br /> be protected below grade within a traffic rated street box. <br /> Each well shall have a permanently attached identification <br /> �. plate containing the following information (1) Well Number, <br /> (2) Wellhead Elevation, (3) Depth of Well, (4) Screened <br /> Interval. <br /> Subsequent to installation the wells shall be developed <br /> to remove silts and improve wall performance. The well <br /> development shall be conducted by air lifting the water <br /> within the well until groundwater pumped from the wells <br /> is silt free. <br /> To assure that cross contamination does not occur between <br /> the drilling and development of successive wells all <br /> equipment contacting subsurface soils or ground water <br /> shall be steam cleaned. The steam cleaned equipment <br /> should include but not limited to the following (1) Dril- <br /> ling Augers, (2) Split Barrel Sampler, (3) Groundwater <br /> Monitoring and Sampling Equipment, (4) Well Development <br /> Piping and Sparging Equipment. <br /> GROI\IMATER <br /> _1 <br /> L--,--. TF-CH\ULOO,iu <br />