Laserfiche WebLink
TABLE 1 <br /> SUMMARY OF FULL-SCALE INSITU REMEDIATION ACTIVITIES <br /> FORMER MARLEY COOLING TOWER SITE <br /> STOCKTON,CALIFORNIA <br /> Volume <br /> Treatment Injected <br /> Date Description Target Areas Number of Borings/Locations (gallons) Reference Document <br /> Full-scale in situ Shallow Zone in North and South <br /> January 16- 509 temporary soil borings for <br /> June 5,2008 remedial action Yards,residential areas south of the reductant injection 2,290,500 <br /> implementation site,and adjacent high school property MWH,2008. Remedial Action <br /> In situ chromium Implementation Completion Report, <br /> May 30-June Shallow groundwater at the former Two recently-installed horizontal <br /> 25,2008 reduction at the retort pit treatment wells 90,800 Former Marley Cooling Tower <br /> former retort pit Company. October <br /> Flushing of vadose <br /> June -July zone at the former Vadose zone soil at the former retort pit Five recently-installed horizontal <br /> 29,,2008 flushing wells 1,150,000 <br /> 2 <br /> retort pit <br /> MWH,2010. 2010 Semiannual <br /> Groundwater Monitoring and <br /> In situ chromium Evaluation Report,Full-Scale In Situ <br /> 2010 retort pit <br /> March 11-30, reduction at the Shallow groundwater at the former Two horizontal treatment wells 90,000 Chromium VI Reduction Treatment <br /> former retort pit Implementation,Former Marley <br /> Cooling Tower Site,Stockton, <br /> California. August. <br /> MWH,2011. 2010 Annual <br /> 11 temporary soil borings at the Groundwater Monitoring and <br /> September 9- Supplemental Shallow and Intermediate Zones around Evaluation Report,Full-Scale In Situ <br /> t situ borings in the North and South former retort pit; 17 temporary soil the former retort pit;Intermediate Zone 1,800,000 Chromium VI Reduction Treatment <br /> October 29, treatment <br /> 2010 in the North and South Yards Yards Implementation,Former Marley <br /> Cooling Tower Site,Stockton, <br /> California.August. <br /> (Page 1 of 1) <br />