Laserfiche WebLink
TABLE 8 <br /> ANALYSIS OF CHROMIUM CONCENTRATIONS AND REDUCTION POTENTIAL <br /> FORMER MARLEY COOLING TOWER SITE <br /> STOCKTON,CALIFORNIA <br /> Current Concentration Percent Change in Concentration Description of Trend for Key Indicator Parameters <br /> Concentrations from Potential for <br /> Monitoring (µg/L) has been Further <br /> Maximum Oxidation Reduction Recommendation <br /> Well Total Chromium Total Chromium Below 50µg/L Chromium Iron Manganese Total Organic Carbon Potential Chromium <br /> Chromium VI Chromium VI Sincea Reduction <br /> Injection Area Wells <br /> Below WQO after spike Stable above WQO Stable above WQO, Variable currently Revert to sitewide compliance monitoring <br /> MW-6 6J <0.5 -98% -100% 10/2010 in 10/2010 possibly decreasing slight increase Low possitive Goal achieved programa <br /> Below WQO, <br /> o Above WQO,below Decreasing since 2008 <br /> MW-8 544 519 -28% <br /> -26% Exceeds baseline injections Near baseline Decreasing after 2008 Positive Low Continue performance monitoring per the MRP <br /> injections <br /> MW-9 5J <0.5 -85% NM Before 2008 Stable below WQO Stable below WQO, Increasing since 7/2010 Low Positive Goal achieved Continue performance monitoring per the MRP <br /> near baseline <br /> Revert to sitewide compliance monitoring <br /> MW-101 5J <0.5 -100% -100% 10/2008 Stable below WQO Below WQO Above baseline Low Positive Goal achieved a <br /> program <br /> MW-102 615 600 -49% -44% Exceeds Stable above Near baseline,possibly Stable above baseline Low Positive Moderate Continue performance monitoring per the MRP <br /> WQO,decreasing trend decreasing <br /> 1/2011 Above WQO Above WQO Spike after 2010 Revert to sitewide compliance monitoring <br /> MW-104(S-2) <10 <0.5 -100% -100% Stable below WQO Positive Goal achieved a <br /> (4/2008) increasing trend increasing trend injections,decreasing program <br /> Above WQO and Above WQO and Revert to sitewide compliance monitoring <br /> MW-105 4J <0.5 -99% -100% 4/2008 Stable below WQO baseline,on a flucuating baseline,on a flucuating Low to moderate Negative Goal achieved a <br /> decreasign trend decreasign trend program <br /> MW-106 232 225 -54% -55% Exceeds Stable above WQO, Below WQO and Baseline(ND) Low Positive Low Continue performance monitoring per the MRP <br /> below baseline baseline <br /> MW-204(S-8) 500 497 -89% -86% Exceeds Above WQO, Slightly above WQO Previously increased, Low Positive Low Continue performance monitoring per the MRP <br /> decreasing trend and baseline and possibly decreasing <br /> MW-205(S-7) 363 342 -49% -50% Exceeds Above WQO, Below WQO and Baseline(ND) Low Positive Low Continue performance monitoring per the MRP <br /> decreasing trend baseline <br /> Increased after 2010 <br /> 12/2010 Increased after 2010 Revert to sitewide compliance monitoring <br /> MW-206 6J <0.5 -100% -100% Stable below WQO injections,decreasing Low Possitive Goal achieved a <br /> (7/2010) near WQO injections,decreasing program <br /> 0 o Fluctuating near and Revert to sitewide compliance monitoring <br /> MW-207 58 56.3 -62% -62/o Exceeds currently above WQO Near baseline Increasing,above WQO Low Positive Low pro ram <br /> MW-208 <10 <0.5 -97% ° Slightly above WQO, Increase in 2nd quarter Revert to sitewide compliance monitoring <br /> -100% Before 2008 Stable below WQO below baseline 2012 program Low Positive Goal achieved a <br /> Below WQO and Revert to sitewide compliance monitoring <br /> MW-300 12 9.73 -60% -51% Before 2008 Stable below WQO Baseline(ND) Low Positive Goal achieved a <br /> baseline program <br /> MW-301 63 59.6 -68% -57% Exceeds Fluctuating near and Slightly above WQO Increase in 2nd quarter Low Positive Low Continue performance monitoring per the MRP <br /> currently above WQO and baseline 2012 <br /> MW-303 5J <0.5 -94% -100% Before 2008 Stable below WQO Near baseline Above baseline Spiked in 2009,since Positive Goal achieved Continue performance monitoring per the MRP <br /> decreased <br /> Revert to sitewide compliance monitoring <br /> TW-12 6J <0.5 -82% -98% Before 2008 Stable below WQO Above baseline Above baseline Variable,decreasing Positive Goal achieved a <br /> program <br /> TW-14e <10 <0.5 -94% NM 1/2009(Before Stable below WQO Above baseline Above baseline Low Positive Goal achieved Continue performance monitoring per the MRP <br /> 2008) <br /> 1/2009(Before Decreasing from high <br /> TW-17 <10 <0.5 -98% NM Stable below WQO Above baseline Above baseline Negative Goal achieved Continue performance monitoring per the MRP <br /> 2008) after injections <br /> EW-1 <10 <0.5 -86% NM 5/2008 Stable below WQO Slightly above WQO, Above baseline Low Positive Goal achieved Continue performance monitoring per the MRP <br /> below baseline <br /> Revert to sitewide compliance monitoring <br /> TW-13 6J <0.5 -100% -100% 4/2010 Stable below WQO Above baseline Above baseline Low Positive Goal achieved a <br /> program <br /> (Page 1 of 3) <br />